loan comp<strong>on</strong>ent <str<strong>on</strong>g>of</str<strong>on</strong>g> the scheme, being <strong>on</strong>ly Rs. 200 per ha. was very unattractive<br />

(CAGL 1998:225). For instance, the achievement in the c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> field<br />

channels in smaller plots <str<strong>on</strong>g>of</str<strong>on</strong>g> 5 ha. <strong>and</strong> below had been <strong>on</strong>ly 19 per cent <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

targeted area while financial achievement is 18 per cent. In case <str<strong>on</strong>g>of</str<strong>on</strong>g> field drains.<br />

in spite <str<strong>on</strong>g>of</str<strong>on</strong>g> the target itself being low. the achievement had been <strong>on</strong>ly 9 per cent.<br />

It <strong>on</strong>ly shows that the authorities c<strong>on</strong>tinue to discriminate the small <strong>farm</strong>ers in<br />

<strong>development</strong> activities. The crucial role <str<strong>on</strong>g>of</str<strong>on</strong>g> field drains does not seem to have<br />

attracted their attenti<strong>on</strong>. Fairly good per<strong>for</strong>mance in the implementati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

Warab<strong>and</strong>i programme is a silver-lining indeed.<br />

Am<strong>on</strong>g the various CAD programmes, as menti<strong>on</strong>ed above, major thrust<br />

has been given <strong>for</strong> engineering activities, such as c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> field channels,<br />

implementati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 'Warab<strong>and</strong>i' <strong>and</strong> c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> field drains. which together<br />

account <strong>for</strong> almost 68 per cent <str<strong>on</strong>g>of</str<strong>on</strong>g> the total expenditure incurred. In terms <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

physical achievement, in almost 42 per cent <str<strong>on</strong>g>of</str<strong>on</strong>g> the total area field channels have<br />

been c<strong>on</strong>structed. followed by area brought under 'Warab<strong>and</strong>i' However, the<br />

executi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> works <strong>on</strong> . Warab<strong>and</strong>i' <strong>and</strong> field channels <strong>and</strong> drains have not been<br />

synchr<strong>on</strong>ised in some projects (C AGI, 1998). The achievement in respect <str<strong>on</strong>g>of</str<strong>on</strong>g> soil<br />

c<strong>on</strong>servati<strong>on</strong> activities, including l<strong>and</strong> levelling <strong>and</strong> shaping has been <strong>on</strong>ly 1120<br />

ha. (43 %) against a target <str<strong>on</strong>g>of</str<strong>on</strong>g> 2590 ha. during the period 1991-92 to 1996-97. The<br />

shortfall has been attributed to the delay II identifying areas <strong>for</strong> l<strong>and</strong> levelling<br />

<strong>and</strong> shaping, because <str<strong>on</strong>g>of</str<strong>on</strong>g> inadequate staff in the soil c<strong>on</strong>servati<strong>on</strong> wing.<br />

The <strong>development</strong> status <strong>and</strong> scenario <str<strong>on</strong>g>of</str<strong>on</strong>g> OFD works across the projects in<br />

the state is more or less the same. The engineering related OFD works seem to<br />

have been given priority in the allocati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> funds. For example. 94 per cent <str<strong>on</strong>g>of</str<strong>on</strong>g><br />