<strong>and</strong> Kayamkulam branch in Phase II. All the Phase I branches are completed <strong>and</strong><br />

Kayamkulam branch is yet to be taken up. In the RB canal system 40<br />

distributaries are fully completed. The works <str<strong>on</strong>g>of</str<strong>on</strong>g> Kayamkulam branch <strong>and</strong> 9<br />

distibutaries are to be completed.<br />

There are three branches In LB canal system, VIZ.,<br />

Oyoor branch.<br />

Kulakkada branch <strong>and</strong> Kottiyam branch out <str<strong>on</strong>g>of</str<strong>on</strong>g> which. Oyoor branch is the <strong>on</strong>ly<br />

<strong>on</strong>e completed. Twenty five distributaries have been fully completed in the LB<br />

canal system while II distributaries are to be completed. Regarding MCS. the<br />

work <str<strong>on</strong>g>of</str<strong>on</strong>g> 28902 ha. are reportedly completed <strong>and</strong> schemes were prepared <strong>and</strong><br />

works arranged <strong>for</strong> 1170 I ha., which are in progress. Schemes are yet to be<br />

prepared <strong>for</strong> 21027 ha. including the Phase II porti<strong>on</strong>. Thus, the total anticipated<br />

extent <str<strong>on</strong>g>of</str<strong>on</strong>g>MCS works is 32728 ha.<br />

4.2.7 Financial requirement <strong>for</strong> balance works<br />

It was estimated that an amount <str<strong>on</strong>g>of</str<strong>on</strong>g> RS.620 crores will be required <strong>for</strong> the<br />

completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the project as per the 1992 schedule <str<strong>on</strong>g>of</str<strong>on</strong>g> rates. But the schedule <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

rates was revised with effect from 01.07.1996.<br />

4.3 Pr<str<strong>on</strong>g>of</str<strong>on</strong>g>ile <str<strong>on</strong>g>of</str<strong>on</strong>g> sample holdings <strong>and</strong> <strong>farm</strong>ers<br />

In the following, we examine the pr<str<strong>on</strong>g>of</str<strong>on</strong>g>ile <str<strong>on</strong>g>of</str<strong>on</strong>g> the <strong>farm</strong>s <strong>and</strong> <strong>farm</strong>ers covered under<br />