07.03.2014 Views

economics of on-farm development - Institute for Social and ...

economics of on-farm development - Institute for Social and ...

economics of on-farm development - Institute for Social and ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

according to the c<strong>on</strong>venti<strong>on</strong>al basin irrigati<strong>on</strong> method. As the existing coc<strong>on</strong>ut<br />

palms are <str<strong>on</strong>g>of</str<strong>on</strong>g> the traditi<strong>on</strong>al variety, an important step is needed to initiate a<br />

massive replanting programme <strong>for</strong> coc<strong>on</strong>ut with HYY planting, coupled with<br />

R&D support. Crops like banana, arecanut, vegetable, tapioca, may also be<br />

brought under irrigati<strong>on</strong> with the redesign intended <strong>for</strong> coc<strong>on</strong>ut.<br />

7,3.4 Financial c<strong>on</strong>straints<br />

The major financial c<strong>on</strong>straints in the irrigati<strong>on</strong> projects in Kerala have already<br />

been discussed in detail in Chapter 4. These c<strong>on</strong>straints mostly relate to<br />

inefficient financial management by the Irrigati<strong>on</strong> Department in the state, which<br />

have resulted in gross under-utilisati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> irrigati<strong>on</strong> potential in irrigati<strong>on</strong><br />

projects, time <strong>and</strong> cost overruns, thin spread <str<strong>on</strong>g>of</str<strong>on</strong>g> financial resources over an array<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> irrigati<strong>on</strong> schemes, etc.<br />

The state government has already initiated several programmes to<br />

improve water use efficiency in the old generati<strong>on</strong> projects through the nt:w<br />

programme <str<strong>on</strong>g>of</str<strong>on</strong>g> revamping <strong>and</strong> c<strong>on</strong>solidati<strong>on</strong>. A serious problem in which Kallada<br />

irrigati<strong>on</strong> project, selected <strong>for</strong> the study is that the project has not been<br />

commissi<strong>on</strong>ed fully even after 40 years. The Minor C<strong>on</strong>veyance System (MCS)<br />

meant <strong>for</strong> efficient water distributi<strong>on</strong> in the comm<strong>and</strong> area is almost defunct <strong>and</strong><br />

its replacement cost today would be more than the original cost <str<strong>on</strong>g>of</str<strong>on</strong>g> the irrigati<strong>on</strong><br />

project. Given these operati<strong>on</strong>al c<strong>on</strong>straints, the efficiency <str<strong>on</strong>g>of</str<strong>on</strong>g> the irrigati<strong>on</strong><br />

system remains questi<strong>on</strong>able. An amount <str<strong>on</strong>g>of</str<strong>on</strong>g> Rs. 907 lakhs is envisaged <strong>for</strong><br />

completing the essential works in the Kallada project to c<strong>on</strong>vey water to the<br />

fields during the period 1999-2000.<br />

315

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!