Another source <str<strong>on</strong>g>of</str<strong>on</strong>g> pilferage relates to defective preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> estimates <strong>and</strong><br />

other departmental lapses J4 • which had resulted in additi<strong>on</strong>al payment <str<strong>on</strong>g>of</str<strong>on</strong>g> Rs. 70.45<br />

lakhs to the c<strong>on</strong>tractor in the Kallada irrigati<strong>on</strong> project. The major reas<strong>on</strong>s<br />

highlighted were mistake in arriving at the rate <strong>for</strong> earthwork excavati<strong>on</strong> (21.5 %),<br />

excess thickness <str<strong>on</strong>g>of</str<strong>on</strong>g> canal lining (20.5 %). irregular sancti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> higher rate <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

excavati<strong>on</strong> (15.89 %) <strong>and</strong> extra expenditure <strong>on</strong> protective blasting (42.11 %). Audit<br />

expenses also <strong>for</strong>ms a major comp<strong>on</strong>ent <str<strong>on</strong>g>of</str<strong>on</strong>g> project costs. [n Chamravattom. it has<br />

been Rs. 4.35 lakhs as per original estimates (July 1965). This has increased to a<br />

revised estimate <str<strong>on</strong>g>of</str<strong>on</strong>g>Rs. 13.23 lakhs (Oct. 1975) <strong>and</strong> to Rs. 37.71 lakhs in Nov. 1983,<br />

escalati<strong>on</strong> being 767 (this <strong>for</strong>ms part <str<strong>on</strong>g>of</str<strong>on</strong>g> indirect charges) (CAGI, 1997).<br />

Similarly. in the Pazhassi project. the CAGI report (1992) indicates that the<br />

time ll\ er-run clln,eljuent lln the: \Ubstanlial change~ Introduced in the scope <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

proJe~t<br />

has resulted In an increase in the project cost from Rs. 442.4 lakhs as<br />

\)T1glnall~<br />

estimated In 1960 to Rs. 7735.95 lakhs in February 1988. Defective<br />

alignment <str<strong>on</strong>g>of</str<strong>on</strong>g> the main canal in certain reaches resulted in unintended additi<strong>on</strong>al<br />

expcnditun: <str<strong>on</strong>g>of</str<strong>on</strong>g> Rs. 15.~7<br />

lakhs <strong>on</strong> their strengthening. However, acti<strong>on</strong> <strong>for</strong> the<br />

recovery <str<strong>on</strong>g>of</str<strong>on</strong>g> Rs. 7.75 lakhs due from a defaulting c<strong>on</strong>tractor had not been initiated till<br />

September 1991 though the reln'ant c<strong>on</strong>tract was terminated in September 1979<br />

H<br />

The integrated planned programme <str<strong>on</strong>g>of</str<strong>on</strong>g> cutting. dumping <strong>and</strong> simultaneolls filling (<str<strong>on</strong>g>of</str<strong>on</strong>g><br />

pipelines) cll\lsagcd under the agrccmcnt could not he adhered to <strong>on</strong> account <str<strong>on</strong>g>of</str<strong>on</strong>g> failure to<br />

supply pipcs In tlnlc.1 his proccdural lapsc resultcd in an arhitrati<strong>on</strong> award "r Rs. 15.84<br />

Ia~hs to thc c<strong>on</strong>lrac\or In 1985 including an intcrcst <str<strong>on</strong>g>of</str<strong>on</strong>g> Rs. 2.08 lakhs. The total c"pcnditurc<br />