07.03.2014 Views

economics of on-farm development - Institute for Social and ...

economics of on-farm development - Institute for Social and ...

economics of on-farm development - Institute for Social and ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 6.13: Details <str<strong>on</strong>g>of</str<strong>on</strong>g> the Revamping <strong>and</strong> C<strong>on</strong>solidati<strong>on</strong> Programme <strong>for</strong> old<br />

generati<strong>on</strong> irrigati<strong>on</strong> projects in Kerala<br />

Project<br />

Malampuzha<br />

Pothundy<br />

Mangalam<br />

Walayar<br />

Gayathri<br />

Neyyar<br />

Vazhani<br />

Cheerakuzhi<br />

Peechi<br />

Total<br />

Estimated cost (Rs. Lakhs) <strong>for</strong> ;<br />

Est.<br />

Exp. Target<br />

Head<br />

Cost<br />

I Main I Branch Distribu I during 1999-<br />

I<br />

I<br />

,<br />

,<br />

works canal I canal - taries : 1998-99 2000<br />

1658<br />

279.2 1110.22 268.49<br />

0<br />

24.35<br />

(30) (16.8) (67.0) (162)<br />

455<br />

(6.5)<br />

813 53.5 150.6 593.75 15.15 78.87<br />

(14) (6.6) (18.5) (73.()l ( 1. 9) (20.9)<br />

255<br />

430 7 22.64 204 197 53.17<br />

(8) ( 16) (5.3) (47.4) (45.8) (\ 4.1)<br />

155<br />

370 27 155 126.81 60.64 20.47<br />

(7) (7.3 ) (41.9) (34.3 ) (16.4) (5.4)<br />

200<br />

700 42 284.45 331.07 42.48 31.35<br />

(13) (6.0) (40.6) (47.3 ) (6.1 ) (8.3 )<br />

220<br />

380 35 118.7 158.1 68.2 86.6<br />

(7) (9.2) (31.2) ( 41.6) (17.9) (23.0)<br />

170<br />

145 8 45.5 75.5 16 17.59<br />

(3) (5.5 ) (31.4) (52.1) ( 11.0) (4.7)<br />

100<br />

230 25 166 39 3.65<br />

0<br />

(4) (10.9)[ (72.2) (17.0)<br />

, ( 1.0)<br />

11 5<br />

810 50.5 ! 412 201.1 146.4 i 60.78<br />

( 14) ; (6.2) ! (50.9) (24.8) ( 18. I ) (16.1 )<br />

285<br />

5536 i 248 I 1634.09 2839.55 814.36 : 376.83<br />

(100.0) I (4.5) I (295) (51.3) (14.7) I (100.0)<br />

Note: (I) Parenthellc figures III cols. 2 & 7 are shares <str<strong>on</strong>g>of</str<strong>on</strong>g> each projects III<br />

estimated cost <strong>and</strong> expenditure during 1998-99, respectively: (ii) Parenthetic<br />

figures in rest <str<strong>on</strong>g>of</str<strong>on</strong>g> the columns are share <str<strong>on</strong>g>of</str<strong>on</strong>g> major comp<strong>on</strong>ents in each case.<br />

Source: Compiled from GOK (1999): 85.<br />

It can be seen that the thrust <str<strong>on</strong>g>of</str<strong>on</strong>g> rehabilitati<strong>on</strong> programme. as generally<br />

expected, is <strong>on</strong> the repair <strong>and</strong> restructuring <str<strong>on</strong>g>of</str<strong>on</strong>g> the main <strong>and</strong> branch canals. which<br />

are important to take water to the tertiary level. In seven projects. including the<br />

Peechi project, a major share ranging between 31 to 72 per cent was allocated <strong>for</strong><br />

revamping the main canal systems. While the allocati<strong>on</strong> <strong>for</strong> main canal works<br />

was highest in Cheerakuzhi project with n per cent. <strong>for</strong> the branch canals, it ""as<br />

I<br />

I<br />

,<br />

1955 I<br />

I<br />

7 The projects brought under the Revamping <strong>and</strong> C<strong>on</strong>solidati<strong>on</strong> Programme<br />

(RCP) are Malampuzha. I'othundy, Mangalam. Walavar. Gayathri, Neyyar.<br />

Vazhani, Cheerakuzhl <strong>and</strong> Peechi.<br />

238

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!