07.03.2014 Views

economics of on-farm development - Institute for Social and ...

economics of on-farm development - Institute for Social and ...

economics of on-farm development - Institute for Social and ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix 6.1: Project-Wise Physical And Financial Per<strong>for</strong>mance <str<strong>on</strong>g>of</str<strong>on</strong>g> CAD<br />

Programmes in Kerala, 1985-86 to 1994-95<br />

Activities! Wing Physical Financial Cost per I Physical T Share <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

achievement Expense ha.(Rs.) achievement each item<br />

(Hectares) (Rs. I (% share) in finances<br />

Lakhs) (%)<br />

I. Malampuzha Project<br />

I. Agri. Wing 11118 53.99 485.57 15.50 408<br />

2. Soil C<strong>on</strong>servati<strong>on</strong> 0 000 0001 000 0.00<br />

3. Engineering 50443 1269.40 2516.50·. 70.34 95.92<br />

4. Evaluati<strong>on</strong> 10152 0.00 0.00 14.16 0.00<br />

Sub total 71713 1323.38 1845.39 100.00 100.00<br />

2. Peechi Project<br />

1. Agri. Wing 7053 50.53 716.48 16.29 4.6 I<br />

2. Soil C<strong>on</strong>servati<strong>on</strong> 335 10.49 3132.54 0.77 0.96<br />

3. Engineering 35313 1035.17 2931.42 81.55 94.43<br />

4. Evaluati<strong>on</strong> 602 0.00 0.00 1.39 0.00<br />

Sub total 43303 1096.20 2531.46 100.00 100.00<br />

3. Walavar Pro'ect<br />

I. Agri. Wing 798 1.75 2 I 8.67 24.89 1.55<br />

2. Soil C<strong>on</strong>servati<strong>on</strong> 0 000 0.00 0.00 i 0.00<br />

3. Engineerin~ 2089 i 110.96 5311.73 65.16 98.4,±-<br />

4. Evaluati<strong>on</strong> 319 . ,<br />

0.01 2.51 ,<br />

9.95 0.01<br />

Sub total 3206 I 12.72 3515.75 100.00 100.00<br />

4. Gavathri Pro' ect<br />

I. Agri. Wing 2472 7.05 285.07 19.35 2.78<br />

2. Soil C<strong>on</strong>servati<strong>on</strong> 0 0.00 0.00 0.00 0.00<br />

3. Engineering 9507 246.49 2592.68 74.4 I 97.22<br />

4. Evaluati<strong>on</strong> 798 0.00 0.38 6.25 0.00<br />

Sub total 12777 253.54 1984.32 100.00 10000<br />

5. Pothundy Pro'ect<br />

I. Agri. Wing 2298 8.67 377.46 15.27 3.40<br />

2. Soil C<strong>on</strong>servati<strong>on</strong> 23 0.63 2721.74 0.15 0.25<br />

3. Engineerin~ 10267 245.92 2395.29 68.21 96.36<br />

4. Evaluati<strong>on</strong> 2465i 0.00 0.00 16.38 0.00<br />

Sub total 15053 255.22 1695.50 10000 100.00<br />

268

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!