irrigati<strong>on</strong> projects is not up to the expected levels. On the other h<strong>and</strong>. the problems<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> cost <strong>and</strong> time over-runs. capacity under-utilisati<strong>on</strong>. etc .. have been <strong>on</strong> the<br />

increase. raising serious doubts about the very relevance <str<strong>on</strong>g>of</str<strong>on</strong>g> investing in irrigati<strong>on</strong><br />

projects when the state's agriculture has been at an impasse.<br />

This calls <strong>for</strong> a detailed examinati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> various locati<strong>on</strong>-specific <strong>and</strong> other<br />

socio-ec<strong>on</strong>omic factors. influencing the per<strong>for</strong>mance <str<strong>on</strong>g>of</str<strong>on</strong>g> irrigati<strong>on</strong> projects in the<br />

state. A detailed discussi<strong>on</strong> <strong>on</strong> the organisati<strong>on</strong>al aspects <str<strong>on</strong>g>of</str<strong>on</strong>g> major <strong>and</strong> medium<br />

irrigati<strong>on</strong> sector per<strong>for</strong>mance in the state is also worth exploring so as to establish<br />

the missing linkages or the lack <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong>e to <strong>on</strong>e corresp<strong>on</strong>dence between irrigati<strong>on</strong><br />

<strong>development</strong> <strong>and</strong> the post-project agricultural <strong>development</strong> scenario <str<strong>on</strong>g>of</str<strong>on</strong>g> the state.<br />

5.1.1 Physical <strong>and</strong> financial per<strong>for</strong>mance <str<strong>on</strong>g>of</str<strong>on</strong>g> the irrigati<strong>on</strong> sector<br />

As menti<strong>on</strong>ed earlier. <strong>on</strong>ly 79 per cent <str<strong>on</strong>g>of</str<strong>on</strong>g> the irrigati<strong>on</strong> targets could be achieved in<br />

th~<br />

case <str<strong>on</strong>g>of</str<strong>on</strong>g> completed schemes. \\hile the cost escalati<strong>on</strong> had been 611 per cent<br />

(table 5.3). In the ease <str<strong>on</strong>g>of</str<strong>on</strong>g> eight schemes. the achievement was less than 70 per cent.<br />

While the average time taken to complete the schemes was 19 years, five schemes.<br />

viz .. Cheerakuzhi, Pamba, Periyar Valley, Chitturpuzha <strong>and</strong> Kuttiadi projects took<br />

almost 30 vears <strong>for</strong> completi<strong>on</strong>. The cumulative cost <str<strong>on</strong>g>of</str<strong>on</strong>g> infrastructure <strong>development</strong><br />

was Rs. 1.39 lakhs per ha. <strong>on</strong> an average. <strong>and</strong> it was more than Rs. 3 lakhs in two<br />

projects.<br />

---------------------------------<br />

Irrig.ati<strong>on</strong> works: <strong>and</strong> Intensive Paddy Development Yelah works (IPD Yelah) (GOK,<br />

1990:2).<br />

141