amount <str<strong>on</strong>g>of</str<strong>on</strong>g> Rs.2022.75 lakhs was awarded to the c<strong>on</strong>tractors In 171 cases (Table<br />

5.20).<br />

T a bl e 5. 20 : M aJor . reas<strong>on</strong>s stated in the arbitrati<strong>on</strong> awards in Kallada Project<br />

Reas<strong>on</strong>s shown in the awards<br />

Claims<br />

Expcndit<br />

Amount<br />

Share<br />

passed<br />

ure per Shart! in t!xp<br />

involved<br />

(%)<br />

(No.)<br />

case (Rs. (%)<br />

(Rs. Lakhs)<br />

Lakhs)<br />

Defective investigati<strong>on</strong> 150 87.21 1055.44 7.04 52.18<br />

Delav in h<strong>and</strong>ing over the site 77 44.77 304.83 3.96 15.07<br />

Delay in issue <str<strong>on</strong>g>of</str<strong>on</strong>g> dept. materials 55 31.98 I 255.1 4.64 12.61<br />

Failure to provide dumping yards 49 28.49 161.85 3.30 8.00<br />

N<strong>on</strong>-availability <str<strong>on</strong>g>of</str<strong>on</strong>g> power 24 13.95 153.42 6.39 7.58<br />

Delay in finalisati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> design 14 8.1-l 44.59 3.19 2.20<br />

Miscellaneous counts 97 56.40 47.52 0.49 2.35<br />

Total 172 2022.75 11.76 100<br />

Source: Complied from CAGI. 1994.<br />

Am<strong>on</strong>g the various reas<strong>on</strong>s stated in the arbitrati<strong>on</strong> awards, 87 per cent <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

cases were pertaining to defective investigati<strong>on</strong> involving 52 per cent <str<strong>on</strong>g>of</str<strong>on</strong>g> the total<br />

amount <str<strong>on</strong>g>of</str<strong>on</strong>g> th.:: arbitrati<strong>on</strong> amount awarJ.::J. Delay in h<strong>and</strong>ing ov.::r the site wa,<br />

indicated as th.:: sec<strong>on</strong>d maJur r.::as<strong>on</strong> in 45 per cent <str<strong>on</strong>g>of</str<strong>on</strong>g> the claims awarded <strong>and</strong> the<br />

amount involved was 15 per cent. About 32 per cent <str<strong>on</strong>g>of</str<strong>on</strong>g> the claims were pertaining to<br />

delay in the issue <str<strong>on</strong>g>of</str<strong>on</strong>g> departmental materials <strong>and</strong> the amount claimed was almost 13<br />

per cent. Other important claims awarded in the arbitrati<strong>on</strong> were failure to provide<br />

dumping yards, shortage <str<strong>on</strong>g>of</str<strong>on</strong>g> powcr <strong>and</strong> delay in finalisati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the design.<br />

This<br />

shows lack <str<strong>on</strong>g>of</str<strong>on</strong>g> administrative <strong>and</strong> operati<strong>on</strong>al planning, which had obviously resulted<br />

in the emerg.::nc.:: <str<strong>on</strong>g>of</str<strong>on</strong>g> ineflicient <strong>and</strong> less productive irrigati<strong>on</strong> systems in Kerala.<br />