Table 1. 3 .Status <str<strong>on</strong>g>of</str<strong>on</strong>g> C A DP rOl!.rammes in India, 1974-1997<br />

Type <str<strong>on</strong>g>of</str<strong>on</strong>g> programme<br />

Achievement during<br />

Share <str<strong>on</strong>g>of</str<strong>on</strong>g> each<br />

Total up to<br />

1974-75<br />

item (%)<br />

1992-97 end <str<strong>on</strong>g>of</str<strong>on</strong>g> VIII<br />

VIII Plan<br />

plan<br />

I. Phl'sical status (Area in milli<strong>on</strong> fill.)<br />

C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> field<br />

channels<br />

12.19 1.77 13.96 39.35<br />

Warab<strong>and</strong>hi 16.12 2.52 18.64 52.54<br />

L<strong>and</strong> levelling 1.99 0.11 2.10 5.92<br />

Field drains 0.59 0.19 0.78 2.19<br />

Total 30.89 4.59 35.48 100.00<br />

/I. Financial status (Rs. in crores)<br />

Central sector expo 1081.22 607.07 1688.29 32.23<br />

State sector expo 2091.73 1458.77 3550.50 67.77<br />

Total 3172.95 2065.84 5238.79 100.00<br />

Source: GOI, Plannmg CommissIOn, Nmth Five Year Plan (1997-2002).<br />

Since its incepti<strong>on</strong>, the total area covered under different CAD<br />

programmes till the end <str<strong>on</strong>g>of</str<strong>on</strong>g> the Eighth Plan was 35.48 milli<strong>on</strong> ha. with an<br />

investment <str<strong>on</strong>g>of</str<strong>on</strong>g> Rs. 5238.79 crores. The achievement <str<strong>on</strong>g>of</str<strong>on</strong>g> targets, as revealed by the<br />

data presented in the table, seems to be encouraging enough in implementing<br />

warab<strong>and</strong>i programmes (53 %) followed by c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> field channels (39<br />

%). It is somewhat disappointing to note that the progress in l<strong>and</strong> levelling <strong>and</strong><br />

field drains has been poor <strong>and</strong> negligible, particularly, since these two aspects <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

OFD are very crucial to ensuring water use efficiency <strong>and</strong> to the avoidance <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

adverse effects <strong>on</strong> soil in the l<strong>on</strong>g run.<br />

Hence, it is necessary to examme the problems <strong>and</strong> c<strong>on</strong>straints, if any,<br />

c<strong>on</strong>tributing to the less efficient per<strong>for</strong>mance <str<strong>on</strong>g>of</str<strong>on</strong>g> CADA in implementing OFD<br />

works in the commanu areas. It is a fact that lack ur systematic <strong>and</strong> scientific<br />

l<strong>and</strong> <strong>development</strong> (OFD) works have led to several adverse effects <strong>on</strong> soil <strong>and</strong><br />

the envir<strong>on</strong>ment apart from the under-utilisatioll <str<strong>on</strong>g>of</str<strong>on</strong>g> the irrigati<strong>on</strong> potential<br />