place. There were three revisi<strong>on</strong>s J ( in estimates in almost all the projects since the<br />

projects were initiated <strong>and</strong> these revisi<strong>on</strong>s were made at different time points (table<br />

5.17).<br />

Table 5.17: Revisi<strong>on</strong> 0 f Estimates <str<strong>on</strong>g>of</str<strong>on</strong>g> irri!!ati<strong>on</strong> proiects (Rs. Lakhs)<br />

I Project Original Revisioll ill estimates % escal. Approl'ed by<br />

eSlimate / II III (Orig. tu III) Plan. ('omm.<br />

Periyar valley 348.00 1795.00 3971.00 6305 1711.78 3971 (II)<br />

Chinurpuzha 105.63 624.14 2063.29 2080 1869.14 624.14 (I)<br />

Kallada 1328.00 16357.00 45780 69800 515602 16357 (I)<br />

Pamba I 384.00 2015.97 4297.00 6340 155104 4297 (II)<br />

,<br />

Pazhassi 442.40 1481.85 4200 7735.94 1648.63 4200 (II)<br />

Kuttiadi<br />

I<br />

496.04 1520.00 4485.00 5500 1008.78 4485 (II)<br />

Kan i irapuzha 365.00 1052.20 4307.73 1000 173.97 1052.20 (I)<br />

Karapuzha 760.00 4042.00 22500 0 0 760·<br />

Chim<strong>on</strong>y 632.11 2951.21 3615.29 0 0 3615.29 (II)<br />

Muvanupuzha 208600 4808.15 8925.02 45500 2081.21 4808.15 (I)<br />

Vamanapuram 1982.00 3640.00 26000 0 0 3640 (I)<br />

. .<br />

Note: • The Planning Commissi<strong>on</strong> has approved <strong>on</strong>ly the Original estimate .<br />

Source: Compiled from Per<strong>for</strong>mance Budget <str<strong>on</strong>g>of</str<strong>on</strong>g> the Irrigati<strong>on</strong> Department, 1991 <strong>and</strong> 2000.<br />

:'1.5 alread~<br />

discussed. cost escalati<strong>on</strong> has been the highest in the Kallada<br />

irrigati<strong>on</strong> project. ie .. 5156 per cent <strong>and</strong> the lowest in respect <str<strong>on</strong>g>of</str<strong>on</strong>g> Kanjirapuzha (174<br />

%). An important point that emerges out <str<strong>on</strong>g>of</str<strong>on</strong>g> the table is that the revisi<strong>on</strong>s have been<br />

made without the approval from the Planning Commissi<strong>on</strong>. The Planning<br />

Commissi<strong>on</strong> has approved <strong>on</strong>ly the first re\'isi<strong>on</strong>s in the estimates <str<strong>on</strong>g>of</str<strong>on</strong>g> the projects<br />

such as Kallada. Chitturpuzha, Kanjirapuzha. Muvattupuzha valley <strong>and</strong><br />

Vamanapuram. Whereas. the projects. viz .. I'eriyar Valley. Pamba. Pazhassi,<br />

Kuttiadi <strong>and</strong> Chim<strong>on</strong>y have received appro\ ,j <strong>for</strong> sec<strong>on</strong>d revisi<strong>on</strong>. In fact. the<br />

31 A project estllnate. when changed after getting approval from the Planning<br />

Commissi<strong>on</strong> at least <strong>on</strong>ce. is called a revised estimate.<br />

184