(ii)<br />

In the Karapuzha project. the originally estimated ayacut <str<strong>on</strong>g>of</str<strong>on</strong>g> 4650 ha. (net) <strong>for</strong><br />

paddy cultivati<strong>on</strong> had dcciined 2H to 3500 ha. in the revised projt:ct report. the<br />

decline being almost 25 per cent. The BeR also had come down from<br />

originally fixed 2.5 to 1. which was also below the ewe stipulated norm <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

1.5. The original cost estimate <str<strong>on</strong>g>of</str<strong>on</strong>g> the project was Rs. 7.60 crores. which has<br />

been revised later <strong>on</strong> to Rs. 225 crores. the cost escalati<strong>on</strong> being 2861 per<br />

cent (C\GI. 1997).<br />

(iii)<br />

In the Chim<strong>on</strong>y irrigati<strong>on</strong> project. the department claims that 13000 ha. <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

Kole l<strong>and</strong>s are being irrigated during m<strong>on</strong>so<strong>on</strong> after dewatering. But. the<br />

actual achievement is <strong>on</strong>ly 1586 ha. (12 %j <strong>and</strong> that too <strong>for</strong> the third crop.<br />

The t:stimated nCR <strong>for</strong> the project was 2.70. which. in reality. declined to<br />

O.:'i making IS n<strong>on</strong>-\labk (C-\Gl. 1999).<br />

The above discussi<strong>on</strong> brings out c<strong>on</strong>siderable er0SlOn 111<br />

the anticipated<br />

benefits from irrigati<strong>on</strong> dut: to the dt:cline in paddy area. coupled with lower prices<br />

<strong>for</strong> paddy. This has made many <str<strong>on</strong>g>of</str<strong>on</strong>g> the projects as ec<strong>on</strong>omically n<strong>on</strong>-viable based <strong>on</strong><br />

the BCR <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.5. fixed by th.: ewe. As a major porti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the ayacut <str<strong>on</strong>g>of</str<strong>on</strong>g> irrigati<strong>on</strong><br />

projects has been c<strong>on</strong>verted into commercial/ cash crops. reworking <str<strong>on</strong>g>of</str<strong>on</strong>g> the benefits<br />

<strong>and</strong> costs <str<strong>on</strong>g>of</str<strong>on</strong>g> the irrigati<strong>on</strong> scheme: Illay give a higher HCR. Since tht: projects arc not<br />

~. The original project report (1978) cln is~ged <strong>on</strong>ly producti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> paddY in ·1650 ha (net). But in<br />

the revised project rcport. out <str<strong>on</strong>g>of</str<strong>on</strong>g> IIIC nd ayacut area <str<strong>on</strong>g>of</str<strong>on</strong>g> 5221 ha .. paddY cilitivati()n was limited<br />

It) 3500 ha <strong>and</strong> the balance J 721 ha. '"'' set apart <strong>for</strong> cultivati<strong>on</strong> llf banana (1621 hal ~nd ginger<br />

,llld vegetables ( 100 ha.).<br />

180