proper coordinati<strong>on</strong> between variOUS line departments has been yet another<br />

problem.<br />

It is reiterated that ··the scope <str<strong>on</strong>g>of</str<strong>on</strong>g> CAD programmes has turned out to be<br />

c<strong>on</strong>siderably narrower than originally envisaged. The progress in terms <str<strong>on</strong>g>of</str<strong>on</strong>g> l<strong>and</strong><br />

improvements <strong>and</strong> <strong>development</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> drainage facilities have been meager <strong>and</strong> so<br />

has the ef<strong>for</strong>t <strong>and</strong> research involving <strong>and</strong> propagating cropping patterns <strong>and</strong><br />

agricultural practices <strong>for</strong> optimum use <str<strong>on</strong>g>of</str<strong>on</strong>g> water under the c<strong>on</strong>diti<strong>on</strong>s prevailing in<br />

each irrigati<strong>on</strong> comm<strong>and</strong>" (GOL Eighth Plan. 1992: 60-61).<br />

In spite <str<strong>on</strong>g>of</str<strong>on</strong>g> the laudable objectives with which CADA was launched, III<br />

practice, the scope <str<strong>on</strong>g>of</str<strong>on</strong>g> the programme proved out to be much narrower than<br />

envisaged. focusing largely <strong>on</strong> the c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> field channels. introducti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

.. Warab<strong>and</strong>i" <strong>and</strong> l<strong>and</strong> levelling (Vaidvanathan 1999). Achievements have also<br />

- -<br />

been somewhat modest. At the end <str<strong>on</strong>g>of</str<strong>on</strong>g> the Seventh Plan. an estimated 8 milli<strong>on</strong><br />

ha. was brought under "Warab<strong>and</strong>i". 2 milli<strong>on</strong> ha. were levelled <strong>and</strong> shaped <strong>and</strong><br />

field channels c<strong>on</strong>structed in 11.3 milli<strong>on</strong> ha. There was no progress in<br />

c<strong>on</strong>solidati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> l<strong>and</strong> holdings. Achievements have been c<strong>on</strong>sistently below<br />

targets. For instance. during the Seventh Plan. the achievements in respect <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

strategic programmes like c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> field channels was below 48 per cent,<br />

followed by Warab<strong>and</strong>i (54 %) <strong>and</strong> <strong>on</strong>ly 23 per cent in the case <str<strong>on</strong>g>of</str<strong>on</strong>g> l<strong>and</strong> levelling<br />

(GO!, 1992).<br />

As a matter <str<strong>on</strong>g>of</str<strong>on</strong>g> fact. not many studies have probed into the reas<strong>on</strong>s <strong>for</strong><br />

such poor per<strong>for</strong>mance. especially at the macro level. A few studies at the micro<br />

level have not addressed these issues in their totality <strong>and</strong> hardly any linkages<br />

230