cost. This is an illustrative example as to how the irrigati<strong>on</strong> policies <strong>and</strong><br />

programmes take twists <strong>and</strong> turns in the absence <str<strong>on</strong>g>of</str<strong>on</strong>g> time-bound co-ordinated<br />

executive <strong>and</strong> operati<strong>on</strong> plans.<br />

It is important to note that while examining the impact <str<strong>on</strong>g>of</str<strong>on</strong>g> irrigati<strong>on</strong> in the<br />

Kallada project, this dynamics need proper underst<strong>and</strong>ing <strong>and</strong> interpretati<strong>on</strong>,<br />

because. the ground realities play an important role in explaining why the social<br />

benefits <str<strong>on</strong>g>of</str<strong>on</strong>g> irrigati<strong>on</strong> in Kerala have been far from expected levels <strong>and</strong> desired<br />

directi<strong>on</strong>s. An attempt has been however. made in what follows to examine the<br />

success <str<strong>on</strong>g>of</str<strong>on</strong>g> the MCS in the Kallada project, even if it is in a limited scale, based<br />

<strong>on</strong> the field data available.<br />

6.2.2.1 Minor C<strong>on</strong>veyance System (MCS): Operati<strong>on</strong>al status <strong>and</strong> impact<br />

It appears that the enthusiasm to implement MCS in the project was apparently<br />

very high. For instance. the comm<strong>and</strong> area surveyed to bring under the MCS was<br />

much higher than the targeted area.<br />

But. when it was translated into<br />

implementati<strong>on</strong> <strong>and</strong> operati<strong>on</strong>alisati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the programme at the field level. the<br />

story was altogether disappointing as revealed from the data presented in table<br />

6.22. It is clear that <strong>on</strong>ly in 73 per cent <str<strong>on</strong>g>of</str<strong>on</strong>g> the area targeted <strong>for</strong> MCS<br />

infrastructure was completed What is worse is its utilisati<strong>on</strong>. The potential<br />

utilised under MCS was ahout <strong>on</strong>e third. Less than <strong>on</strong>e third <str<strong>on</strong>g>of</str<strong>on</strong>g> the area was<br />

h<strong>and</strong>ed over to the Water Users' Associati<strong>on</strong>s (WUAs). Based <strong>on</strong> the in<strong>for</strong>mati<strong>on</strong><br />

provided hy the project <str<strong>on</strong>g>of</str<strong>on</strong>g>ficials. it was also understood that no further work with<br />

regard to MCS implementati<strong>on</strong> was taken up during the last few years due to<br />

financial c<strong>on</strong>straints.<br />