07.03.2014 Views

economics of on-farm development - Institute for Social and ...

economics of on-farm development - Institute for Social and ...

economics of on-farm development - Institute for Social and ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

per<strong>for</strong>mance <str<strong>on</strong>g>of</str<strong>on</strong>g> irrigati<strong>on</strong> systems in India. Even after almost two decades <str<strong>on</strong>g>of</str<strong>on</strong>g> its<br />

existence. the CADA has not been able to meet even its basic objectives <str<strong>on</strong>g>of</str<strong>on</strong>g> l<strong>and</strong><br />

de\clopmem <strong>and</strong> improvement in distributi<strong>on</strong> network in the comm<strong>and</strong> area<br />

especially below the outlet (Mitra. 1983. 1997: 26).<br />

The Eighth Plan also revealed that 'the scope <str<strong>on</strong>g>of</str<strong>on</strong>g> CAD programmes has<br />

turned out to be c<strong>on</strong>siderably narrower than originally envisaged. The progress in<br />

terms <str<strong>on</strong>g>of</str<strong>on</strong>g> l<strong>and</strong> improvements <strong>and</strong> drainage facilities has been meagre <strong>and</strong> so has<br />

the ef<strong>for</strong>t <strong>and</strong> research involving <strong>and</strong> propagating cropping patterns <strong>and</strong><br />

agricultural practices <strong>for</strong> optimum use <str<strong>on</strong>g>of</str<strong>on</strong>g> water under the c<strong>on</strong>diti<strong>on</strong>s prevailing in<br />

each irrigati<strong>on</strong> comm<strong>and</strong>" (001, 1992: 60-61).<br />

It may also be noted that the scope <str<strong>on</strong>g>of</str<strong>on</strong>g> the CAD programme has been<br />

c<strong>on</strong>fined mostly to c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> field channels. introducti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> . Warab<strong>and</strong>i'<br />

<strong>and</strong> l<strong>and</strong> levelling. Accordingly. by the end <str<strong>on</strong>g>of</str<strong>on</strong>g> the Seventh Plan. an estimated 8<br />

milli<strong>on</strong> ha. had been brought under ·Warab<strong>and</strong>i'. 2 milli<strong>on</strong> ha. had been levelled<br />

<strong>and</strong> shaped, <strong>and</strong> field channels c<strong>on</strong>structed in an area <str<strong>on</strong>g>of</str<strong>on</strong>g> 11.3 milli<strong>on</strong> ha. There<br />

was no progress in l<strong>and</strong> c<strong>on</strong>solidati<strong>on</strong> programmes, <strong>and</strong> in most cases,<br />

achievements had been c<strong>on</strong>sistently below targets. For instance, during the<br />

Seventh Plan, the achievements in respect <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> field channels were<br />

below 48 per cent <strong>and</strong> that in the case <str<strong>on</strong>g>of</str<strong>on</strong>g> Warab<strong>and</strong>i it was 54 per cent <strong>and</strong> <strong>on</strong>ly<br />

23 per eent in the case <str<strong>on</strong>g>of</str<strong>on</strong>g> lal1lllevelling (001, 1992).<br />

The data <strong>on</strong> the status uf per<strong>for</strong>mance in physical <strong>and</strong> tinancial terms under<br />

various CAD programmes in India are presented in table 1.3.<br />

20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!