07.03.2014 Views

economics of on-farm development - Institute for Social and ...

economics of on-farm development - Institute for Social and ...

economics of on-farm development - Institute for Social and ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 6.2. Physical <strong>and</strong> financial targets <strong>and</strong> achievements <str<strong>on</strong>g>of</str<strong>on</strong>g> CAD Schemes,<br />

1991-1997<br />

CAD Activities<br />

Financial per<strong>for</strong>mance Physical per<strong>for</strong>mance (%)<br />

(Rs. in crores) (Area in 000 ha.) share<br />

Ach.<br />

Target Ach.<br />

Ach.<br />

Target Ach.<br />

(%) (%)<br />

Field channels# 55.44 51.68 93 99.87 88.89 89 36<br />

Field channels· 2.54 0.47 18 72.97 14.22 19 6<br />

Warab<strong>and</strong>i 13.21 10.6 80 133.87 76.45 57 31<br />

Field drains 2.39 0.85 35 78.50 6.84 9 3<br />

i Adaptive trials 0.58 0.09 15 20.09 15.73 78 6<br />

I LSD@' 5.74 3.17 55 67.74 43.54 6..t 17<br />

Others 38.94 27.17 70 Nil Nil Nil Nil<br />

Total 118.84 94.03 79 473.03 245.68 52 100<br />

- -<br />

Note: # up to )-8 ha. block; • within )-8 ha. block; @ Large-scale Dem<strong>on</strong>strati<strong>on</strong>.<br />

Source: CADA (1998).<br />

In<br />

area<br />

(%)<br />

share<br />

In expo<br />

54.96<br />

0.50<br />

11.27<br />

0.90<br />

0.10<br />

3.37<br />

28.90<br />

100.00<br />

It is noteworthy that nom: <str<strong>on</strong>g>of</str<strong>on</strong>g> the CAD schemes could achieve physical<br />

<strong>and</strong> financial tar~ct~<br />

hen thL' Illust important ikms <str<strong>on</strong>g>of</str<strong>on</strong>g> OFD. \·iz .. field channels<br />

Jnd drains have IHlt heen completed as per the programme envisaged.<br />

Furthermore. the achievement in the c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> field channels in smaller<br />

plots (below 5 ha.) has been very disappointing both in financial <strong>and</strong> physical<br />

terms. The shortfall has heen attrlhuted by CADA to smaller size <str<strong>on</strong>g>of</str<strong>on</strong>g> holdings. as<br />

small <strong>farm</strong>ers are reluctant to part with l<strong>and</strong> free <str<strong>on</strong>g>of</str<strong>on</strong>g> cost <strong>for</strong> c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> field<br />

channels <strong>and</strong> drains Furthermore. delay in finalisati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> tenders. <strong>for</strong>mati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

BFAs <strong>and</strong> n<strong>on</strong>-availability <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> materials. like cement. paucity <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

staff. etc. (CAGI. 199R: 223) have also c<strong>on</strong>tributed to the low progress. Same is<br />

the case with field drains. which are very crucial to reduce adverse effects <strong>on</strong><br />

soil. Such a lag in the achievement <str<strong>on</strong>g>of</str<strong>on</strong>g> these two crucial aspects is due to the fact<br />

that these were to be c<strong>on</strong>structed hy the ramlers availing loan frlll11 C ADA. The<br />

210

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!