3) Again. due to the high density <str<strong>on</strong>g>of</str<strong>on</strong>g> populati<strong>on</strong> causmg high density <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

dwellings <strong>and</strong> fragmented holdings. field channels cannot be c<strong>on</strong>structed<br />

straight from the spout to the fields. Many turns are necessary which ~dd to<br />

unit cost <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong>.<br />

Lack <str<strong>on</strong>g>of</str<strong>on</strong>g> adequate resources with the <strong>farm</strong>ers has added to the slow<br />

progress <str<strong>on</strong>g>of</str<strong>on</strong>g> drainage works. It is also true <str<strong>on</strong>g>of</str<strong>on</strong>g> other activities like l<strong>and</strong> levellino<br />

""<br />

bunding <strong>and</strong> shaping. Only 43 per cent <str<strong>on</strong>g>of</str<strong>on</strong>g> the targeted area was levelled by 1997<br />

(CAGI. 1998:228). The project authorities reported that was essentially due to<br />

lack <str<strong>on</strong>g>of</str<strong>on</strong>g> adequate staff to carry out the work at the field level.<br />

The above observati<strong>on</strong>s based <strong>on</strong> the aspects <str<strong>on</strong>g>of</str<strong>on</strong>g> physical <strong>and</strong> financial<br />

status <str<strong>on</strong>g>of</str<strong>on</strong>g> per<strong>for</strong>mance <str<strong>on</strong>g>of</str<strong>on</strong>g> the irrigati<strong>on</strong> projects reveal that the CAD programmes<br />

in the comm<strong>and</strong> areas <str<strong>on</strong>g>of</str<strong>on</strong>g> Kerala. in general. are not properly designed,<br />

implemented <strong>and</strong> uperated. A wide range <str<strong>on</strong>g>of</str<strong>on</strong>g> issues. viz., inadequate financial<br />

resources. improper targeting <str<strong>on</strong>g>of</str<strong>on</strong>g> the beneficiaries. political <strong>and</strong> local dynamics<br />

influencing prioritisati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the programmes. lack <str<strong>on</strong>g>of</str<strong>on</strong>g> scientific survey to estimate<br />

the scale <strong>and</strong> intensity <str<strong>on</strong>g>of</str<strong>on</strong>g> OFD works to be carried out in different projects, badly<br />

managed delivery systems, etc., have been identified as important factors<br />

c<strong>on</strong>tributing towards the less efficient <strong>and</strong> low scale OFD operati<strong>on</strong>s in the<br />

comm<strong>and</strong> areas.<br />

Given the problems <strong>and</strong> c<strong>on</strong>straints as discussed above. an ef<strong>for</strong>t was<br />

made by the state government to improve the operati<strong>on</strong>al efficiency <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

irrigati<strong>on</strong> projects. A brief review <str<strong>on</strong>g>of</str<strong>on</strong>g> the new programme intending to revamp the<br />

old generati<strong>on</strong> projects in the state is in order. The thrust <str<strong>on</strong>g>of</str<strong>on</strong>g> the programme is to<br />