escalatio.n in the process o.f irrigati<strong>on</strong> develo.pment The \arious comp<strong>on</strong>ents In cost<br />

escalati<strong>on</strong> in the case 0.1' f!\t: irrigatio.n projects han: been compared as sh,'" n in<br />

table 5.16.<br />

Table 5.16: Majo~ factors causing cost escalati<strong>on</strong> ("!o)<br />

SQurces <str<strong>on</strong>g>of</str<strong>on</strong>g> cosl escalatioll<br />

!<br />

,<br />

Periyar Chittur<br />

Pa::hassi Kalljlru·<br />

Kuttiadi<br />

"ulley -pu=ilO project Pu=hll<br />

Rise in cost <str<strong>on</strong>g>of</str<strong>on</strong>g> labour & material 48.1 38.7 47.0 43.0 52.1<br />

Inadequate financial provisi<strong>on</strong> 44.1 ~0.7 20.6 8.1 22.4<br />

Inadequate investigati<strong>on</strong> 1.7 4.0 5.1 11.9 4.2<br />

Chanue in design 4.7 1.6 I 13.7 21.2 3.8<br />

Cost <str<strong>on</strong>g>of</str<strong>on</strong>g> l<strong>and</strong> 0.1 20.2 13.5 15.8 7.S<br />

Others 1.3 14.8 0.1 0 10.0<br />

Total ]00 100 100 100 100<br />

Source: Compiled from Netto (1990).<br />

It is evident that the costs o.f labo.ur <strong>and</strong> materials have been the maJo.r<br />

so.urces <str<strong>on</strong>g>of</str<strong>on</strong>g> cost escalati<strong>on</strong> in these five projects. ranging between 38 per cent in<br />

Chitturpuzha project \(1 52 per cent in Kanjir~lpuLha irrigati<strong>on</strong> pWJt:ct \\'hik<br />

inadequate financial pro.visi<strong>on</strong> has been the sec<strong>on</strong>d major factor leading til cost<br />

escalatio.n in projects. viz .. Periyar Valb (44 %). KanjirapuLha (22 %j.<br />

Chitturpuzha (20.7 %) <strong>and</strong> Kuttiadi (20.6 %). tht: cost o.f l<strong>and</strong> acquisiti<strong>on</strong> has been<br />

significant in rcspt:ct <str<strong>on</strong>g>of</str<strong>on</strong>g> Chitturpuzha (20.2 %J. l'aLhassi (15.8 %) <strong>and</strong> Kuttiadi (I ~.5<br />

%). Other factors c<strong>on</strong>tributing to cost escalati<strong>on</strong> have been change in design <strong>and</strong><br />

inadequate investigatio.n <str<strong>on</strong>g>of</str<strong>on</strong>g> the schemes.<br />

Upward revisi<strong>on</strong> in estimates<br />

As an outco.me <str<strong>on</strong>g>of</str<strong>on</strong>g> the rise in costs <str<strong>on</strong>g>of</str<strong>on</strong>g> l<strong>and</strong> acquisiti<strong>on</strong>. labour <strong>and</strong> material costs. it is<br />

ob~ious<br />

that frequent revisi<strong>on</strong>s in the estimates <str<strong>on</strong>g>of</str<strong>on</strong>g> irrigati<strong>on</strong> projccts had takt:n<br />