10.07.2015 Views

User's Manual - Kitagawa Europe

User's Manual - Kitagawa Europe

User's Manual - Kitagawa Europe

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MAC mini iH Series Parameter・Expansion <strong>Manual</strong> ParameterPRM028 [ NAME ] G99FIN Check Timer[ MESSAGE] G99FIN CHECK TIMER【DATA UNIT】 : sec【DATA RANGE】 : 0.00~9.99DescriptionSets a time checked to ZRN signal input that is the check signal when handshake (Checkedby signal delivery) is executed with the external equipment.When G98, G99 and G21L99 command blocks are executed, G99FIN is outputted and itsG99FIN OUTPUT is turned OFF when the INPUT of ZRN signal (PRM029=“2”) ischecked. When the ZRN signal that is the G99 check signal is not inputted within this settime, 『 Err.217 G99FIN TIME-OUT 』 occurs.PRM027=1,PRM028≠0,PRM029=2When start signal is not OFF within PRM035 time.START SIGG99FIN(G99FIN)ZRN INPUT signal(for checking G99)BLKFIN SIG(BLKFIN)PRM035PRM027=1,PRM028≠0,PRM029=2 In case of table rotation.When start signal is not OFF within PRM035 time.START SIGREV.G99FIN(G99FIN)ZRN INPUT signal(for checking G99)BLKFIN SIG(BLKFIN)PRM035Precautions 1. For G21L99 command, this parameter is invalid. When G21L99 is commanded,G99FIN is outputted when it is started.2. When PRM028=0 or PRM029≠2 is established when PRM027=1 is set,『 Err.217G99FIN TIME-OUT 』 occurs.Concerned parameters PRM027,PRM029PRM029 [ NAME ] External ZRN Input Spec.[ MESSAGE] EXT ZRN SPEC【DATA RANGE】 : 0,1,2Description Selects the specification of ZRN INPUT SIGNAL.【 0 】 : External MZRNPerforms MZRN by inputting ZRN in MANUAL mode.KITAGAWA P1-25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!