7. be maintained in effect until final payment is made unless otherwise agreed to in<br />

writing by BIDDER, Owner, CMAR, and Engineer with thirty days written notice to each<br />

other additional insured to whom a certificate of insurance has been issued.<br />

The policies of insurance required to be purchased and maintained by BIDDER in<br />

accordance with this paragraph 5.06 shall comply with the requirements of paragraph<br />

5.06C.”<br />

B. Delete Paragraph 5.06B. of the General Conditions in its entirety and insert the following<br />

in its place:<br />

“5.06 B. BIDDER shall purchase and maintain such boiler and machinery insurance or<br />

additional property insurance as may be required by the Supplementary Conditions or<br />

Laws and Regulations which will include the interests of BIDDER, Owner, CMAR,<br />

Subcontractors, Engineer, Engineer's Consultants and any other persons or entities<br />

identified in paragraph 5.04 B.1 (SC‐18) of these Supplementary Conditions, each of<br />

whom is deemed to have an insurable interest and shall be listed as an insured or<br />

additional insured.”<br />

C. Delete Paragraph 5.06 D. of the General Conditions in its entirety and insert the following<br />

in its place:<br />

“D. Owner/CMAR shall not be responsible for purchasing and maintaining any insurance<br />

to protect the interest of the <strong>Bid</strong>ders, Subcontractors, or others in the Work. The stated<br />

limits of insurance required are minimum only. <strong>Bid</strong>der shall determine the limits that are<br />

adequate . These limits may be basic policy limits or any combination of basic limits and<br />

umbrella limits. In any event, <strong>Bid</strong>der is fully responsible for all losses arising out of,<br />

resulting from or connected with operations under this contract whether or not said<br />

losses are covered by insurance. The acceptance of certificates or other evidence of<br />

insurance by the Owner, Engineer, CMAR and/or others listed as additional insured in<br />

Paragraph 5.04 B.1 (SC‐18) that in any respect do not comply with the Contract<br />

requirements does not release the <strong>Bid</strong>der from compliance herewith.”<br />

D. Delete Paragraph 5.06 E. of the General Conditions in its entirety.<br />

SC‐6.05 Make the following modifications to 6.05 Substitutes and “Or Equals”<br />

A. Delete paragraph 6.05 A. in its entirety and add the following:<br />

“6.05 Substitutes and “Or Equals”<br />

A. Where equipment and products are specified by name, no substitutes or “or‐equal”<br />

will be considered or approved unless the term “or‐equal” is included in the acceptable<br />

manufacturer section of that Specification.<br />

Supplementary Conditions (Revised per <strong>Garney</strong>)<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project - Pump Stations 00 73 00 - 12<br />

12/28/2011