3.10 TRAINING<br />

A. Provide an integrated training program for the Owner's personnel, both at the Supplier's<br />

factory or training center and at the jobsite. The Contractor shall submit a detailed training<br />

schedule and syllabus for approval. Tailor the training program to meet the specific needs<br />

of the Owner's personnel. Include training sessions, classroom and field, for managers,<br />

engineers, operators, and maintenance personnel.<br />

B. The training shall be carried out by technically competent and experienced instructors.<br />

C. An "instructor week" shall consist of 40 hours of actual instruction time. An "instructor day"<br />

shall consist of 8 hours of actual instruction time. Provide instruction on any or all three<br />

working shifts as needed to accommodate the Owner's personnel schedule. The actual<br />

1<br />

training schedule shall be coordinated with thee the Owner.<br />

D. The Contract shall hire a professional firm regularly engaged in video tape and/or film<br />

productions to video tape of all of the factory and on-site training sessions. The video tape<br />

and all rights there to shall become the property of the Owner. The Owner may re-use or<br />

distribute the video tape at their discretion.<br />

3.11 OPERATIONS AND MAINTENANCE TRAINING<br />

A. O&M training for each subsystem shall be in accordance with the requirements specified<br />

under the related Instrumentation specification sections.<br />

B. All training shall be given using only equipment identical to the equipment provided on this<br />

Contract or currently owned by the Owner.<br />

C. Unless otherwise specified, hardware maintenance training shall be suitable for instrument<br />

technicians who have at least a 2-year associate engineering or technical degree, or<br />

equivalent education and experience in electronics, instrumentation, or digital systems.<br />

3.12 ON-SITE SUPERVISION<br />

The Supplier shall provide, on-site, an experienced resident engineering manager to supervise<br />

and coordinate all of the on-site activities. This resident engineering manager shall be on-site as<br />

required during the total period to affect all the activities relating to the PICS.<br />

3.13 START-UP AND TESTING TEAM<br />

A. The Supplier shall provide, on-site, a team of experienced engineering, technician, trades<br />

personnel, and software/configuring personnel during the total construction period to:<br />

1. Thoroughly check the installation, termination, and adjustment of all the subsystems<br />

and their components.<br />

2. Perform and complete all on-site tests.<br />

Supervisory Control and Data Acquisition (SCADA) System 40 90 02-35<br />

CMD11269 – Ward County Transmission System Expansion – Contract C – Above Slab TPS, OPS, and WPS