<strong>Bid</strong><br />

<strong>Package</strong><br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project – <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

Description and Price in Words<br />

Total Cost in Figures<br />

**If the length of Column Piping changes during the final pump design from the size<br />

and length as indicated in Specification Section 11 97 00, Attachment A they will be<br />

changed by Change Order per VLF (includes only the pipe, no drop check valves) as<br />

follows:**<br />

Adder for 6” column pipe installed will be $__________________ per VLF<br />

Deduct for 6” column pipe not installed will be<br />

Adder for 8” column pipe installed will be<br />

Deduct for 8” column pipe not installed will be<br />

$__________________ per VLF<br />

$__________________ per VLF<br />

$__________________ per VLF<br />

** The base bid for each well’s transducer cable is 25 feet longer than the column pipe<br />

length for each well as indicated in Specification Section 11 97 00, Attachment A. If<br />

the column piping changes during the final pumping design the cable will be changed<br />

accordingly by a Change Order per VLF as follows:**<br />

Adder for Transducer Cable installed will be $__________________ per VLF<br />

Deduct for Transducer Cable not installed will be<br />

$__________________ per VLF<br />

**If the Conveyance Piping changes during the final pump design from the size and<br />

length as indicated in Specification Section 11 97 00, Attachment A, they will be<br />

changed by Change Order per VLF (includes pipe and all accessories as detailed on<br />

DWG No. M-1) as follows:**<br />

Adder for 8” conveyance pipe installed will be $__________________ per VLF<br />

Deduct for 8” conveyance pipe not installed will be $__________________ per VLF<br />

Adder for 10” conveyance pipe installed will be<br />

$__________________ per VLF<br />

Deduct for 10” conveyance pipe not installed will be $__________________ per VLF<br />

**If the Column Piping changes during the final pump design from the size and length<br />

as indicated in Specification Section 11 97 00, Attachment A the drop check valves will<br />

change accordingly. All other items will be adjusted accordingly with the Column<br />

Piping VLF as indicated above but the unit prices below will be used to adjust the drop<br />

check valves:<br />

Drop Check Valve – 6” $__________________ each<br />

Drop Check Valve – 8”<br />

$__________________ each<br />

<strong>Bid</strong> Proposal Form – <strong>Bid</strong> <strong>Package</strong> #8<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project – <strong>North</strong> <strong>Well</strong> <strong>Field</strong> BP - 4<br />