B. Use test equipment and instruments to simulate inputs and read outputs suitable for<br />

purpose intended and rated to an accuracy of at least five times greater than the required<br />

accuracy of device being calibrated. Such test equipment shall have accuracies traceable to<br />

the National Bureau of Standards as applicable.<br />

2.04 SPECIAL PROJECT REQUIREMENTS<br />

A. As a part of this Contract, the instrumentation systems CONTRACTOR shall coordinate with<br />

the Owner and with all the sub-systems suppliers and manufacturers, during bidding,<br />

construction, testing, installation and start-up phases of the project. The coordination is to<br />

assure that the instruments and sub-systems are in compliance with the Contract<br />

Documents and that the necessary tie-ins and interface signals with the existing system are<br />

provided as specified or required.<br />

B. The instrumentation system CONTRACTOR shall provide the OWNER's staff with all required<br />

training and operating procedures, at no extra cost to the OWNER, in addition to the SCADA<br />

training specified in Section 40 90 02, “Supervisory Control and Data Acquisition (SCADA)<br />

System”. The training schedule shall be coordinated with the OWNER's Representative.<br />

Training shall include operating, testing, calibration and programming of the system, and<br />

simple troubleshooting of the system. The training shall include manuals which are<br />

specifically written for the system provided as described in Division 1 - General<br />

Requirements of these Specifications.<br />

C. The calibration, testing, and start-up of all the instruments whether existing or provided<br />

new, shall be done by the manufacturer's field technician/ENGINEER in the presence of the<br />

OWNER. The CONTRACTOR shall provide a list of all manufacturers whose technicians will<br />

perform this work. The CONTRACTOR shall also provide a certified calibration report stating<br />

that each instrument shown or specified in the Contract Documents has been installed,<br />

tested and calibrated per manufacturer's recommendations and per these Contract<br />

Documents.<br />

D. Follow-up Services: After the acceptance of the system, the CONTRACTOR shall make two<br />

(2) trips to the project site for calibration and adjustment of all the instruments and devices,<br />

including the SCADA system. The first trip shall be three months after acceptance of the<br />

complete system, and thereafter every three months for a total of four trips. These trips<br />

are in addition to all warranty items, and shall be at no extra cost to the OWNER. The<br />

CONTRACTOR shall provide the services of a trained technician for each trip with<br />

appropriate calibration and testing instruments. All defects shall be immediately remedied.<br />

The trips shall be coordinated with the OWNER.<br />

Instrumentation and Control for Process Systems 40 90 00-7<br />

CMD11269 – Ward County Transmission System Expansion – Contract C – Above Slab TPS, OPS, and WPS