25.10.2014 Views

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

01 78 23 OPERATION AND MAINTENANCE DATA<br />

1.00 GENERAL<br />

1.01 WORK INCLUDED<br />

A. Prepare a complete and detailed Operation and Maintenance Manual for each type and<br />

model of equipment or product furnished and installed under this <strong>Bid</strong> Proposal.<br />

B. Prepare the manuals in the form of an instruction manual for the Owner. The manual is to<br />

be suitable for use in providing operation and maintenance instruction as required by<br />

Section 01 75 00, Starting And Adjusting.<br />

C. Provide complete and detailed information specifically for the products or systems provided<br />

for this Project. Include the information required to operate and maintain the product or<br />

system.<br />

D. Manuals are to be in addition to any information packed with or attached to the product<br />

when delivered. This information is to be taken from the product and provided as an<br />

attachment to the manual.<br />

E. Cost for O&M Manuals provided by Suppliers and Subcontractors as described in this section<br />

are to be included in the <strong>Bid</strong> Proposal. Costs for <strong>Bid</strong>der’s efforts are to be include in the <strong>Bid</strong><br />

Proposal.<br />

1.02 SUBMITTALS<br />

A. Submit manuals in accordance with Section 01 33 00, Submittal Procedures. Attach to each<br />

manual a copy of the Operation and Maintenance Manual Review Form as shown in Section<br />

01 31 13.13, Forms with pertinent information completed.<br />

1.03 GUARANTEES<br />

A. Provide copies of the Manufacturer's warranties, guarantees, or service agreements in<br />

accordance with Section 01 70 00, Execution And Closeout Requirements.<br />

2.00 PRODUCTS<br />

2.01 MATERIALS<br />

A. Print manuals on heavy, first quality paper.<br />

1. Paper shall be 8 1/2 inch X 11 inch paper.<br />

a. Reduce drawings and diagrams to 8 1/2 inch X 11 inch paper size.<br />

b. When reduction is not practical, fold drawings and place each separately in a clear,<br />

super heavy weight, top loading polypropylene sheet protector designed for ring<br />

binder use. Provide a typed identification label on each sheet protector.<br />

2. Punch paper for standard three-ring binders.<br />

B. Place manuals in Wilson Jones 385 Line D-Ring Dubllock Presentation Binders.<br />

1. Binders are to have clear front, back, and spine covers.<br />

2. Sheet lifters are to be provided.<br />

3. Minimum size is 2 inch capacity. Maximum size is 3 inch capacity.<br />

Operation and Maintenance Data – <strong>Bid</strong> <strong>Package</strong> #8 01 78 23-1<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project – <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

5/24/2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!