- Page 1 and 2: BIDDING DOCUMENTS for the Ward Coun
- Page 3 and 4: Advertisement for Bids
- Page 5 and 6: these qualifications will be disqua
- Page 7 and 8: 00 10 00 INSTRUCTIONS TO BIDDERS 1.
- Page 9 and 10: 6. Substitutions or "equivalent" It
- Page 11 and 12: B. In evaluating Bids, Owner / Engi
- Page 13 and 14: Bid Proposal Form
- Page 15 and 16: Colorado River Municipal Water Dist
- Page 17 and 18: Bid Package Colorado River Municipa
- Page 19 and 20: Colorado River Municipal Water Dist
- Page 21 and 22: 1. Legal / Financial Colorado River
- Page 23 and 24: Colorado River Municipal Water Dist
- Page 25 and 26: Colorado River Municipal Water Dist
- Page 27 and 28: Colorado River Municipal Water Dist
- Page 29 and 30: Colorado River Municipal Water Dist
- Page 31 and 32: Colorado River Municipal Water Dist
- Page 33 and 34: Colorado River Municipal Water Dist
- Page 35 and 36: Colorado River Municipal Water Dist
- Page 37: Colorado River Municipal Water Dist
- Page 43 and 44: 00 61 13.13 Performance Bond Contra
- Page 45 and 46: 00 61 13.16 Payment Bond Contractor
- Page 47 and 48: 00 62 13 CERTIFICATE OF INSURANCE T
- Page 49 and 50: STANDARD GENERAL CONDITIONS OF THE
- Page 51 and 52: TABLE OF CONTENTS Page ARTICLE 1 -
- Page 53 and 54: 11.02 Cash Allowances .............
- Page 55 and 56: 15. CONTRACTOR--The individual or e
- Page 57 and 58: adjectives of like effect or import
- Page 59 and 60: produce the intended result will be
- Page 61 and 62: B. ENGINEER’s Review: After recei
- Page 63 and 64: elief it is unsafe, or does not agr
- Page 65 and 66: 5.06 Property Insurance A. Unless o
- Page 67 and 68: providing the property insurance sh
- Page 69 and 70: approved Shop Drawing for an “or
- Page 71 and 72: 3. To the fullest extent permitted
- Page 73 and 74: and be compatible with the design c
- Page 75 and 76: CONTRACTOR’s failure to so report
- Page 77 and 78: B. In connection with ENGINEER’s
- Page 79 and 80: the claimant or the last submittal
- Page 81 and 82: 1. the allowances include the cost
- Page 83 and 84: 13.01 Notice of Defects A. Prompt n
- Page 85 and 86: OWNER may, after seven days written
- Page 87 and 88: emaining after deduction of the amo
- Page 89 and 90:
14.09 Waiver of Claims A. The makin
- Page 91 and 92:
17.05 Controlling Law A. This Contr
- Page 93 and 94:
00 73 00 SUPPLEMENTARY CONDITIONS T
- Page 95 and 96:
the cost for performing all work is
- Page 97 and 98:
Specifications or details do not ne
- Page 99 and 100:
“4.02.A.3 Copies of these reports
- Page 101 and 102:
Workers' Compensation, etc., under
- Page 103 and 104:
(1) General Aggregate $1,000,000 (2
- Page 105 and 106:
1. If substitutes or “or equals
- Page 107 and 108:
E. The Bidder shall obtain from eac
- Page 109 and 110:
“If Engineer/CMAR determines that
- Page 111 and 112:
1. Schedules: Review the progress s
- Page 113 and 114:
to Engineer Written Amendments, Cha
- Page 115 and 116:
individuals involved in additional
- Page 117 and 118:
“4. Owner may permanently withhol
- Page 119 and 120:
Summary of Work
- Page 121 and 122:
finishing, curing, patching, grindi
- Page 123 and 124:
1.08 CONSTRUCTION UTILITIES A. Cost
- Page 125 and 126:
01 29 00 PAYMENT PROCEDURES 1.00 GE
- Page 127 and 128:
applicable) prior to submitting the
- Page 129 and 130:
Project Management and Coordination
- Page 131 and 132:
1.05 PERMITS A. Building Permit wil
- Page 133 and 134:
B. Repair or correct any damage to
- Page 135 and 136:
3. Limit operations to the minimum
- Page 137 and 138:
K. Maintain storage facilities. Ins
- Page 139 and 140:
e. Cost proposal, when applicable.
- Page 141 and 142:
END OF SECTION Project Management a
- Page 143 and 144:
01 31 13 PROJECT COORDINATION 1.00
- Page 145 and 146:
A. Submit Request for Information (
- Page 147 and 148:
3. Field Orders may be issued by th
- Page 149 and 150:
Construction Progress Schedule (See
- Page 151 and 152:
6. Successor and predecessor relati
- Page 153 and 154:
Bid Package #8 ‐ Raw Water Supply
- Page 155 and 156:
01 33 00 SUBMITTAL PROCEDURES 1.00
- Page 157 and 158:
1. Use a separate transmittal form
- Page 159 and 160:
c. Compare the performance features
- Page 161 and 162:
D. Provide Samples for comparison w
- Page 163 and 164:
1. Contract Modification Request fo
- Page 165 and 166:
Quality Requirements
- Page 167 and 168:
B. Provide labor, materials, tools,
- Page 169 and 170:
1.05 DELIVERY AND STORAGE A. Handle
- Page 171 and 172:
1. Planning Phase. Perform the foll
- Page 173 and 174:
2. Conduct tests on buried pipe to
- Page 175 and 176:
4. Continue the test for one hour a
- Page 177 and 178:
a. The maximum allowable deflection
- Page 179 and 180:
a. Perform insulation resistance te
- Page 181 and 182:
4,160 Volt ‐ 3 Phase Per Manufact
- Page 183 and 184:
2. Submit copy of report of laborat
- Page 185 and 186:
Temporary Facilities and Controls
- Page 187 and 188:
1.06 TEMPORARY SANITARY FACILITIES
- Page 189 and 190:
Temporary Controls
- Page 191 and 192:
B. Perform Work to comply with “B
- Page 193 and 194:
2. Construct temporary earthen dike
- Page 195 and 196:
Product Requirements
- Page 197 and 198:
1.03 SUBMITTALS Bidder assumes all
- Page 199 and 200:
further protect against dust, moist
- Page 201 and 202:
Execution and Closeout Requirements
- Page 203 and 204:
4. Final Operations and Maintenance
- Page 205 and 206:
2. Within 10 days after inspection
- Page 207 and 208:
01 74 23 FINAL CLEANING 1.00 GENERA
- Page 209 and 210:
Starting and Adjusting
- Page 211 and 212:
3.01 SERVICES OF SUPPLIER'S' REPRES
- Page 213 and 214:
14. Content and use of Operation an
- Page 215 and 216:
Operation and Maintenance Data
- Page 217 and 218:
C. Provide tab indexes for each sec
- Page 219 and 220:
e. Directory of a local source of s
- Page 222 and 223:
This page intentionally left blank.
- Page 224 and 225:
Raw Water Supply Well Sites Ward Co
- Page 226 and 227:
This page intentionally left blank.
- Page 228 and 229:
Colorado River Municipal Water Dist
- Page 230 and 231:
This page intentionally left blank.
- Page 232 and 233:
Colorado River Municipal Water Dist
- Page 234 and 235:
This page intentionally left blank.
- Page 236 and 237:
Colorado River Municipal Water Dist
- Page 238 and 239:
Colorado River Municipal Water Dist
- Page 240 and 241:
This page intentionally left blank.
- Page 242 and 243:
This page intentionally left blank.
- Page 244 and 245:
Colorado River Municipal Water Dist
- Page 246 and 247:
This page intentionally left blank.
- Page 248 and 249:
This page intentionally left blank.
- Page 250 and 251:
Colorado River Municipal Water Dist
- Page 252 and 253:
Colorado River Municipal Water Dist
- Page 254 and 255:
This page intentionally left blank.
- Page 256 and 257:
This page intentionally left blank.
- Page 258 and 259:
This page intentionally left blank.
- Page 260 and 261:
This page intentionally left blank.
- Page 262 and 263:
Colorado River Municipal Water Dist
- Page 264 and 265:
Colorado River Municipal Water Dist
- Page 266 and 267:
Colorado River Municipal Water Dist
- Page 268 and 269:
This page intentionally left blank.
- Page 270 and 271:
Colorado River Municipal Water Dist
- Page 272 and 273:
Colorado River Municipal Water Dist
- Page 274 and 275:
This page intentionally left blank.
- Page 276 and 277:
Colorado River Municipal Water Dist
- Page 278 and 279:
This page intentionally left blank.
- Page 280 and 281:
This page intentionally left blank.
- Page 282 and 283:
Colorado River Municipal Water Dist
- Page 284 and 285:
600V CABLE TEST REPORT CHECK LIST 1
- Page 286 and 287:
MOTOR START UP REPORT CHECK LIST 1.
- Page 288 and 289:
SWITCHGEAR TEST REPORT CHECKLIST
- Page 290 and 291:
TRANSFORMER TEST CHECK LIST 1. Chec
- Page 292 and 293:
Colorado River Municipal Water Dist
- Page 294 and 295:
Colorado River Municipal Water Dist
- Page 296 and 297:
Colorado River Municipal Water Dist
- Page 298 and 299:
Colorado River Municipal Water Dist
- Page 300 and 301:
Colorado River Municipal Water Dist
- Page 302 and 303:
Colorado River Municipal Water Dist
- Page 304 and 305:
Colorado River Municipal Water Dist
- Page 306 and 307:
Colorado River Municipal Water Dist
- Page 308 and 309:
Colorado River Municipal Water Dist
- Page 310 and 311:
This page intentionally left blank.
- Page 312 and 313:
Colorado River Municipal Water Dist
- Page 314 and 315:
Colorado River Municipal Water Dist
- Page 316 and 317:
Colorado River Municipal Water Dist
- Page 318 and 319:
Colorado River Municipal Water Dist
- Page 320 and 321:
Colorado River Municipal Water Dist
- Page 322 and 323:
This page intentionally left blank.
- Page 324 and 325:
This page intentionally left blank.
- Page 326 and 327:
Colorado River Municipal Water Dist
- Page 328 and 329:
This page intentionally left blank.
- Page 330 and 331:
Colorado River Municipal Water Dist
- Page 332 and 333:
Colorado River Municipal Water Dist
- Page 334 and 335:
Colorado River Municipal Water Dist
- Page 336 and 337:
Colorado River Municipal Water Dist
- Page 338 and 339:
Colorado River Municipal Water Dist
- Page 340 and 341:
Colorado River Municipal Water Dist
- Page 342 and 343:
Colorado River Municipal Water Dist
- Page 344 and 345:
Colorado River Municipal Water Dist
- Page 346 and 347:
Colorado River Municipal Water Dist
- Page 348 and 349:
Colorado River Municipal Water Dist
- Page 350 and 351:
Colorado River Municipal Water Dist
- Page 352 and 353:
This page intentionally left blank.
- Page 354 and 355:
Colorado River Municipal Water Dist
- Page 356 and 357:
Colorado River Municipal Water Dist
- Page 358 and 359:
Colorado River Municipal Water Dist
- Page 360 and 361:
Colorado River Municipal Water Dist
- Page 362 and 363:
Colorado River Municipal Water Dist
- Page 364 and 365:
Colorado River Municipal Water Dist
- Page 366 and 367:
Colorado River Municipal Water Dist
- Page 368 and 369:
Colorado River Municipal Water Dist
- Page 370 and 371:
This page intentionally left blank.
- Page 372 and 373:
Colorado River Municipal Water Dist
- Page 374 and 375:
Colorado River Municipal Water Dist
- Page 376 and 377:
Colorado River Municipal Water Dist
- Page 378 and 379:
Colorado River Municipal Water Dist
- Page 380 and 381:
Colorado River Municipal Water Dist
- Page 382 and 383:
Colorado River Municipal Water Dist
- Page 384 and 385:
This page intentionally left blank.
- Page 386 and 387:
Colorado River Municipal Water Dist
- Page 388 and 389:
This page intentionally left blank.
- Page 390 and 391:
This page intentionally left blank.
- Page 392 and 393:
Colorado River Municipal Water Dist
- Page 394 and 395:
Colorado River Municipal Water Dist
- Page 396 and 397:
Colorado River Municipal Water Dist
- Page 398 and 399:
Colorado River Municipal Water Dist
- Page 400 and 401:
This page intentionally left blank
- Page 402 and 403:
Colorado River Municipal Water Dist
- Page 404 and 405:
Colorado River Municipal Water Dist
- Page 406 and 407:
Colorado River Municipal Water Dist
- Page 408 and 409:
Colorado River Municipal Water Dist
- Page 410 and 411:
Colorado River Municipal Water Dist
- Page 412 and 413:
This page intentionally left blank.
- Page 414 and 415:
This page intentionally left blank.
- Page 416 and 417:
This page intentionally left blank.
- Page 418 and 419:
This page intentionally left blank.
- Page 420 and 421:
This page intentionally left blank.
- Page 422 and 423:
100.01.11 Facility Extension Agreem
- Page 424 and 425:
100.01.31 Suitable Space The requir
- Page 426 and 427:
100.04 Security and Safety 100.04.0
- Page 428 and 429:
Any change from the Company designa
- Page 430 and 431:
CLEARANCES FOR SERVICE DROP FIGURE
- Page 432 and 433:
CLEARANCE OF SWIMMING POOLS FROM UN
- Page 434 and 435:
SCREENING CLEARANCES AROUND PADMOUN
- Page 436 and 437:
300.11 Overhead Service to Mobile o
- Page 438 and 439:
OVERHEAD SERVICE ATTACHMENTS FIGURE
- Page 440 and 441:
OVERHEAD SERVICE TO A SERVICE MAST
- Page 442 and 443:
OVERHEAD SERVICE TO A WALL MOUNTED
- Page 444 and 445:
OVERHEAD SERVICE TO FOUR OR MORE SE
- Page 446 and 447:
SECTION 400 - UNDERGROUND SERVICE 4
- Page 448 and 449:
(2) The service equipment complies
- Page 450 and 451:
UNDERGROUND SERVICE ONE RESIDENTIAL
- Page 452 and 453:
UNDERGROUND SERVICE, TWO OR MORE SE
- Page 454 and 455:
UNDERGROUND SERVICE METER PEDESTAL
- Page 456 and 457:
electric service conductors from a
- Page 458 and 459:
center (unmetered) phase of the met
- Page 460 and 461:
COMPANY - CUSTOMER RESPONSIBILITY F
- Page 462 and 463:
46 APPLICATION WIRES PHASE VOLTS SE
- Page 464 and 465:
48 APPLICATION WIRES PHASE VOLTS SE
- Page 466 and 467:
METER AND SOCKET APPLICATION GUIDE
- Page 468 and 469:
TRANSOCKET CONFIGURATIONS AND CONNE
- Page 470 and 471:
TYPICAL SERVICE ENCLOSURES FIGURE 5
- Page 472 and 473:
GANG METER SOCKETS MULTIFAMILY TYPI
- Page 474 and 475:
METER SOCKET CONNECTIONS AND VOLTAG
- Page 476 and 477:
METER SOCKET CONNECTIONS AND VOLTAG
- Page 478 and 479:
SECTION 600 - TEMPORARY SERVICE INS
- Page 480 and 481:
TEMPORARY SERVICE POLE FROM UNDERGR
- Page 482 and 483:
TWO HOLE COMPRESSION LUGS FOR TERMI
- Page 484 and 485:
ONE HOLE COMPRESSION LUGS FOR SUBME
- Page 486 and 487:
This page intentionally left blank.
- Page 488 and 489:
This page intentionally left blank.
- Page 490 and 491:
This page intentionally left blank.
- Page 492 and 493:
This page intentionally left blank.
- Page 494 and 495:
1.02 QUALITY ASSURANCE A. GENERAL:
- Page 496 and 497:
1.06 SUBMITTALS 5. Operating accura
- Page 498 and 499:
2. Approximate location of primary
- Page 500 and 501:
E. All control software developed f
- Page 502 and 503:
1 b. Provide all required labor, ma
- Page 504 and 505:
7. Software 8. Spare Parts 2 1 9. M
- Page 506 and 507:
1 d. Any interferences shall be not
- Page 508 and 509:
F. Operation and Maintenance Manual
- Page 510 and 511:
B. Include all hardware, firmware,
- Page 512 and 513:
B. The control system shall be conf
- Page 514 and 515:
3. Safety Function Wiring: a. Emerg
- Page 516 and 517:
. Memory battery backup shall be ca
- Page 518 and 519:
2.04 COAXIAL CABLE A. Coaxial cable
- Page 520 and 521:
1 2.08 RTU CABINET A. TPS, OPS and
- Page 522 and 523:
J. Acceptable RTU cabinet manufactu
- Page 524 and 525:
2.12 SERIAL RADIO ANTENNAS A. Yagi:
- Page 526 and 527:
3.00 EXECUTION 3.01 INSTALLATION A.
- Page 528 and 529:
B. Testing shall include the follow
- Page 530 and 531:
H. Where hardware items are of stan
- Page 532 and 533:
3) Tag number for each component 4)
- Page 534 and 535:
H. The CONTRACTOR shall expedite th
- Page 536 and 537:
3. Provide start-up assistance. END
- Page 538:
This page intentionally left blank.
- Page 542:
This page intentionally left blank.
- Page 560 and 561:
Project Manual for Vertical Turbine
- Page 562 and 563:
Vertical Turbine Submersible Pumpin
- Page 564 and 565:
Contract Documents
- Page 566 and 567:
AGREEMENT BETWEEN BUYER AND SELLER
- Page 568 and 569:
TABLE OF CONTENTS Article 1 - GOODS
- Page 570 and 571:
intent of the parties that (1) Engi
- Page 572 and 573:
ARTICLE 8 - INTEREST 8.01 All monie
- Page 574 and 575:
ARTICLE 11 - MISCELLANEOUS 11.01 Te
- Page 576:
11.06 Limitations Buyer, (b) to est
- Page 579:
~L Ed Patterson-Principal M.U'i~.dO
- Page 583:
This page intentionally left blank.
- Page 597:
VENDOR COMPLIANCE TO STATE LAW The
- Page 601 and 602:
Brown and Caldwell Engineering: Hor
- Page 603:
This page intentionally left blank.
- Page 618 and 619:
STANDARD GENERAL CONDITIONS FOR PRO
- Page 620 and 621:
TABLE OF CONTENTS Page ARTICLE 1 -
- Page 622 and 623:
STANDARD GENERAL CONDITIONS FOR PRO
- Page 624 and 625:
22. Laws and Regulations; Laws or R
- Page 626 and 627:
specified location) and to perform
- Page 628 and 629:
B. No provision of any such standar
- Page 630 and 631:
to meet the requirements of Paragra
- Page 632 and 633:
a. in the exercise of reaso nable j
- Page 634 and 635:
5.07 Continuing Performance A. Sell
- Page 636 and 637:
5.10 Delegation of Professional Des
- Page 638 and 639:
Change Directive, and submit writte
- Page 640 and 641:
C. Final Inspection: 1. After all o
- Page 642 and 643:
clarifications and interpretations
- Page 644 and 645:
documentation will be s ubmitted as
- Page 646 and 647:
10.07 Waiver of Claims A. The makin
- Page 648 and 649:
. If and to the extent that Seller
- Page 650 and 651:
B. Because data stored in electroni
- Page 652 and 653:
SUPPLEMENTARY CONDITIONS These Supp
- Page 654 and 655:
7. with respect to com pleted opera
- Page 656 and 657:
SC-5.06 Shop Drawings and Samples S
- Page 658 and 659:
B. No demand for arbitration of any
- Page 660 and 661:
BID ADDENDUM FAILURE TO RETURN THIS
- Page 662 and 663:
Specification Section 11210, Append
- Page 664:
BID ADDENDUM FAILURE TO RETURN THIS
- Page 667 and 668:
Daniel B. Stephens & Associates, In
- Page 669 and 670:
Daniel B. Stephens & Associates, In
- Page 671:
This page intentionally left blank.
- Page 674 and 675:
Colorado River Municipal Water Dist
- Page 676 and 677:
Colorado River Municipal Water Dist
- Page 678 and 679:
CONSENT OF SURETY TO FINAL PAYMENT
- Page 680 and 681:
SELLER'S CERTIFICATE THAT ALL CLAIM
- Page 682 and 683:
Seller’s Affidavit of Release of
- Page 684 and 685:
Colorado River Municipal Water Dist
- Page 686 and 687:
Colorado River Municipal Water Dist
- Page 688 and 689:
Colorado River Municipal Water Dist
- Page 690 and 691:
Colorado River Municipal Water Dist
- Page 692 and 693:
Colorado River Municipal Water Dist
- Page 694 and 695:
EQUIPMENT INSTALLATION REPORT (EIR)
- Page 696 and 697:
Colorado River Municipal Water Dist
- Page 698 and 699:
Colorado River Municipal Water Dist
- Page 700 and 701:
Colorado River Municipal Water Dist
- Page 702 and 703:
Colorado River Municipal Water Dist
- Page 704 and 705:
Colorado River Municipal Water Dist
- Page 706 and 707:
Colorado River Municipal Water Dist
- Page 708 and 709:
Colorado River Municipal Water Dist
- Page 710 and 711:
Colorado River Municipal Water Dist
- Page 712 and 713:
Specification Section 11210, Append
- Page 714:
Specification Section 11210, Append