40 90 00 INSTRUMENTATION AND CONTROL FOR PROCESS SYSTEMS<br />

1.00 GENERAL<br />

1.01 SCOPE<br />

A. General Requirements for Instrumentation and Control.<br />

1. There are two areas of work in the Instrumentation Work in this project as described<br />

below:<br />

a. The Instrumentation System Integrator Contractor shall provide all hardware,<br />

software, and configuration and integration associated with the PLC based<br />

Instrumentation and Process Control system. Provide a complete and operational<br />

system in accordance with these Contract Documents:<br />

1) Provide instrumentation, hardware, conductors and raceway required for a<br />

complete and operable system that is above that specified in the Contract<br />

Documents. Provide all labor and materials specified in the Contract<br />

Documents.<br />

b. Provide all required labor, materials and PLC programming and system<br />

configuration and integration to interconnect the I/O as required per the project to<br />

the RTUs (provided under this contract) at the:<br />

1) Transmission Pump Station (TPS),<br />

2) Odessa Pump Station (OPS),<br />

3) <strong>Well</strong> <strong>Field</strong> Pump Station (WPS)<br />

4) Big Spring Pump Station (BPS)<br />

5) And 21 <strong>Well</strong> <strong>Field</strong> stations Sites: Sites D1, D2, D3, D4, D6, D8, D9, D10, D11,<br />

D12, D13, D14, D15, D16, D17, D18, D20, D21, D22, D23 & D24<br />

6) For the locations listed above:<br />

a) Provide all required software and programming in each of the PLCs and<br />

existing computer system for a complete and operational system in<br />

accordance with these Contract Documents.<br />

b) Coordinate and fully cooperate with the OWNER to provide all required<br />

hardware and PLC hardware and PLC programming necessary to interface<br />

with the existing system.<br />

c) Provide personnel to check out, test and commission the system.<br />

d) Provide factory trained personnel to train the OWNER's staff as specified.<br />

e) Provide software programming to create new screens and modify existing<br />

screens on the Graphic User Interface located at each RTU Panel as<br />

specified.<br />

f) Provide the required drivers, if required, to receive and transmit data over<br />

the specified radio system to fully communicate with the PLC systems.<br />

1<br />

Instrumentation and Control for Process Systems 40 90 00-1<br />

CMD11269 – Ward County Transmission System Expansion – Contract C – Above Slab TPS, OPS, and WPS