1<br />

b. Provide all required labor, materials and PLC programming and system<br />

configuration and integration to interconnect the new PLC via the ethernet Radio<br />

System to the existing computer system at the OWNER’s main control station at<br />

the Water Treatment Plant.<br />

5. Big Spring Pump Station (BPS):<br />

a. Provide one (1) PLC. The PLC shall be located at the Pump Station building in a RTU<br />

cabinet. The PLC shall be connected to a ProSoft 2.4GHz radio via RS232 cable.<br />

The cable shall be connected to a Yagi antenna via 1/2” coaxial cable. The radio<br />

shall transmit/receive data from CRMWD’s existing main control station.<br />

b. Provide all required labor, materials and PLC programming and system<br />

configuration and integration to interconnect the new PLC via the 2.4GHz Radio<br />

System to the existing computer system at the OWNER’s main control station at<br />

the Water Treatment Plant.<br />

6. <strong>Well</strong> Sites Stations (typ. of 21 sites):<br />

a. Provide one (1) PLC. The PLC shall be located in a RTU cabinet at the site. The PLC<br />

shall be connected to an Ubiquiti Bullet2 ethernet radio via RS232 cable. The<br />

cable shall be connected to a Yagi antenna via 1/2” coaxial cable. The radio shall<br />

transmit/receive data from CRMWD’s existing main control station, via the <strong>Well</strong><br />

<strong>Field</strong> Pump Station site.<br />

b. Provide all required labor, materials and PLC programming and system<br />

configuration and integration to interconnect the new PLC via the ethernet Radio<br />

System to the existing computer system at the OWNER’s main control station at<br />

the Water Treatment Plant.<br />

c. The RTU Cabinet at each well site shall be installed by others under a separate <strong>Bid</strong><br />

<strong>Package</strong> (the <strong>Well</strong> Site Contractor).<br />

7. Modify existing PLCs at the Owner’s main site as required.<br />

8. Provide all required software and programming in the PLCs and existing computer<br />

system for a complete and operational system in accordance with these Contract<br />

Documents.<br />

9. Coordinate and fully cooperate with the Owner to provide all required hardware and<br />

PLC hardware and PLC programming necessary to interface with the existing system.<br />

10. Provide personnel to check out, test and commission the system.<br />

11. Provide personnel to train the Owner's staff as specified.<br />

12. Provide software programming to create new screens and modify existing screens on<br />

the existing computer system as specified.<br />

13. Provide the required drivers to receive and transmit data over the specified Radio<br />

System to fully communicate with the PLC system. Provide the required drivers at TPS<br />

and Base 21 to receive and transmit data over the specified fiber optic cable system to<br />

fully communicate with the PLC System. The fiber optic system shall be as specified in<br />

Section 27 15 23 “Communications Optical Fiber Horizontal Cabling”.<br />

Supervisory Control and Data Acquisition (SCADA) System 40 90 02-2<br />