25.10.2014 Views

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

D. Buyer’s Acceptance of Non-Conforming Goods:<br />

Instead of requiring correction or removal and replacement of non-conforming Goods discovered<br />

either before or after final paym ent, Buyer may accept the non-conforming Goods. Seller shall<br />

bear all reasonable co sts, losses, and dam ages attributable to Buyer’s evaluation of and<br />

determination to accept such non-conforming Goods as provided in Paragraph 8.02.E.<br />

E. Seller shall pay all cla ims, costs, losses, and damages, including but not lim ited to all fees and<br />

charges for re-inspection, retesting and for a ny engineers, architects, attorneys and other<br />

professionals, and all court or arbitration or ot her dispute resolution costs arising out of or<br />

relating to the non-conforming Goods and Special Services. Seller's obligations shall include the<br />

costs of the correction or rem oval and repl acement of the non-conform ing Goods and the<br />

replacement of property of B uyer and others destroyed by th e correction or removal and<br />

replacement of the non-conform ing Goods, and obt aining conforming Special S ervices from<br />

others.<br />

F. Buyer's Rejection of Conforming Goods:<br />

If Buyer asserts that G oods and S pecial Services are non-conform ing and such Goods and<br />

Special Services are determined to be conforming, or if Buyer reject s as non-conforming Goods<br />

and Special Services that are later determ ined to be conforming, then Selle r shall be entitled to<br />

reimbursement from Buyer of costs incurred by Seller in inspecti ng, testing, correcting,<br />

removing, or replacing the conforming Goods and Special Services, including but not lim ited to<br />

fees and charges of engineers, architects, atto rneys and other professionals, and all court or<br />

arbitration or other di spute resolution costs associated w ith the incorrect assertion of nonconformance<br />

or rejection of conforming Goods and Special Services.<br />

8.03 Correction Period<br />

A. Seller’s responsibility for correcting all non-conformities in the Goods and Special Services will<br />

extend for a period of one year after the earlier of the date on which Buyer has placed the Goods<br />

in continuous service or the date of final paym ent, or for such longer period of tim e as may be<br />

prescribed by Laws or Regulations or by the te rms of any specific provisions of the Contract<br />

Documents.<br />

ARTICLE 9 – ROLE OF ENGINEER<br />

9.01 Duties and Responsibilities<br />

A. The duties and responsibilities a nd the limitations of authority of Engineer are set f orth in the<br />

Contract Documents.<br />

9.02 Clarifications and Interpretations<br />

A. Engineer will issue with reasonable promptness such written clarif ications or interpretations of<br />

the Contract Documents as Engineer may determine necessary, which shall be consistent with or<br />

reasonably inferable from the ove rall intent of the Contract Documents. Such written<br />

EJCDC P-700, Standard General Conditions for Procurement Contracts.<br />

Copyright © 2010 National Society of Professional Engineers, American Council of Engineering Companies,<br />

American Society of Civil Engineers, and Associated General Contractors of America. All rights reserved.<br />

Page 00700-20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!