01 31 00 PROJECT MANAGEMENT AND COORDINATION<br />

1.00 GENERAL<br />

1.01 WORK INCLUDED<br />

A. Furnish equipment, manpower, products, and other items necessary to complete the<br />

Project with an acceptable standard of quality and within the contract time. Construct<br />

Project in accordance with current safety practices.<br />

B. Manage Site to allow access to Site and control construction operations.<br />

C. Provide labor, materials, equipment and incidentals necessary to construct temporary<br />

facilities to provide and maintain control over environmental conditions at the Site. Remove<br />

temporary facilities when no longer needed.<br />

D. Construct temporary impounding works, channels, diversions, furnishing and operation of<br />

pumps, installing piping and fittings, and other construction for control of conditions at the<br />

Site. Remove temporary controls at the end of the Project.<br />

E. Provide temporary controls for pollutions, management of water and management of<br />

excess earth as required in Section 01 57 00 Temporary Controls.<br />

F. Cost for Project Management and Coordination as described in this section are to be<br />

included in the BIDDER’s fee for <strong>Bid</strong> <strong>Package</strong> #8.<br />

1.02 QUALITY ASSURANCE<br />

A. Employ competent workmen, skilled in the occupation for which they are employed.<br />

Provide Work meeting quality requirements of the Contract Documents as determined by<br />

the Owner/CMAR/Engineer .<br />

B. Remove defective Work from the Site immediately unless provisions have been made and<br />

approved by the CMAR/Engineer to allow repair of the product at the Site. Clearly mark the<br />

Work as "Defective" until it is removed or allowable repairs have been completed.<br />

1.03 SUBMITTAL PROCEDURES<br />

C. Provide submittals in accordance with Section 01 33 00, Submittal Procedures:<br />

1.04 STANDARDS<br />

1. Provide copies of Supplier’s printed storage instructions prior to furnishing materials or<br />

products and installation instructions prior to beginning the installation. Maintain one<br />

copy of these documents at the Site until the Project is complete. Incorporate this<br />

information into submittals.<br />

2. Incorporate field notes, sketches, recordings, and computations made by the<br />

CMAR/Engineer in Record Drawings.<br />

A. Perform Work to comply Laws and Regulations.<br />

B. Provide materials and equipment that has National Science Foundation 60/61 approval for<br />

use in potable water supply systems. Advise the Engineer of any material requirements in<br />

these Contract Documents that conflict with National Science Foundation 60/61<br />

requirements.<br />

Project Management and Coordination – <strong>Bid</strong> <strong>Package</strong> #8 01 31 00-1<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project – <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

5/24/2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!