25.10.2014 Views

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

C. Provide tab indexes for each section of the manual.<br />

1. Indexes are to be constructed of heavy-duty paper with a reinforced binding edge and<br />

punched with 9/32 inch holes to fit the binders.<br />

2. Index is to have clear insertable tabs for a typed insert.<br />

2.02 ELECTRONIC MANUAL FORMAT<br />

A. Manual contents to be provided on compact disc (CD).<br />

1. Minimum CD storage capacity is 700MB.<br />

2. CD to have read/write capability.<br />

B. Provide individual electronic files for each manual.<br />

1. Maximum file size is 5MB. If manual is greater than maximum allowable file<br />

size, provide individual files for each major section of manual.<br />

2. Acceptable file types for written documents are Portable Document File (PDF) or<br />

Microsoft Word formats. Acceptable file types for drawing files are PDF<br />

formats. All files shall be compatible with the latest software version available.<br />

3. Filename shall identify the plant site, plant area, equipment manufacturer, and<br />

date equipment placed in service. i.e. WWTP-PC1-Manufacturer-200503.pdf.<br />

4. Each electronic file shall contain a table of contents at the beginning of the file<br />

which includes hypertext links or bookmarks to navigate the file contents per<br />

section/chapter.<br />

5. Scanned images of written documents are not acceptable. Document must<br />

allow character selection. Text within a file shall be transferable to other<br />

documents.<br />

6. Drawing files shall have the ability to turn on/off drawing layers within the file.<br />

7. Submit a preliminary version of the electronic format of the manual for review.<br />

Upon approval of the preliminary submittal, the CMAR shall provide three<br />

copies of the electronic manual to the Owner.<br />

3.00 EXECUTION<br />

3.01 MANUAL ORGANIZATION AND CONTENTS<br />

A. Provide a Table of Contents listing each section of the manual for each product or system.<br />

1. Identify each product or system using the nomenclature shown in the Contract<br />

Documents.<br />

2. Assign a number and letter to each section in the manual.<br />

a. Assign a number to each product or system. The number is to correspond to the<br />

Owner's equipment numbering system or other system designated by the Engineer.<br />

b. A cross reference is to be provided for the Owner's numbering system and<br />

designations for equipment indicated in the Contract Documents.<br />

c. The letter assigned will represent the part of the manual, consistent with the<br />

manual contents as required by Paragraphs 3.02, 3.03, and 3.04.<br />

3. Provide index tabs for each section in the manual.<br />

4. The designation on each index tab is to correspond to the number and letter assigned in<br />

the Table of Contents.<br />

Operation and Maintenance Data – <strong>Bid</strong> <strong>Package</strong> #8 01 78 23-2<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project – <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

5/24/2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!