MOTOR START UP REPORT<br />

CHECK LIST<br />

1. Check motor for physical damage.<br />

2. Check motor for correct size and type per plans and wiring diagram.<br />

3. Check for adequate ventilation, lighting and clearance per N.E.C. and manufacturer's recommendations.<br />

Note discrepancies.<br />

4. Check for appropriate chain, belt or shaft guards.<br />

5. Check wiring and mounting of motor accessories such as: mag. pick-ups, vibration sensors, safety<br />

switches.<br />

T:\specs\<strong>Well</strong> Sites -Elect <strong>Package</strong>\Re<strong>Bid</strong> 05.2012\Div 26 Electrical\26 01 26.02 MOTOR STARTUP REPORT.doc Page 2 of 2