Specifications or details do not need to be indicated or specified in each specification<br />

or drawing. Items shown in the contract documents are applicable regardless of<br />

location in the Contract Documents.<br />

3. Standard paragraph titles and other identifications of subject matter in the<br />

specifications are intended to aid in locating and recognizing various requirements of<br />

the specifications. Titles do not define, limit, or otherwise restrict specification text.”<br />

B. Add new paragraphs “D ‐ F” as follows:<br />

“D. Comply with the most stringent requirements where compliance with two or more<br />

standards is specified, and they establish different or conflicting requirements for<br />

minimum quantities or quality levels, unless Contract Documents indicate otherwise.<br />

1. Quantity or quality level shown or indicated shall be the minimum to be provided<br />

or performed in every instance.<br />

2. Actual installation must meet or exceed the minimum quality indicated.<br />

3. In complying with these requirements, indicated numeric values are minimum or<br />

maximum values, as noted, or appropriate for context of requirements.<br />

4. Refer instances of uncertainty to the CMAR/Engineer for a decision before<br />

proceeding.<br />

E. Provide materials and equipment comparable in quality to similar materials and<br />

equipment incorporated in the project or as required to meet the minimum<br />

requirements of the application if the materials and equipment are shown in the<br />

drawings but are not included in the specifications.<br />

F. The Contract Documents comprise the entire Agreement between <strong>Bid</strong>derr and CMAR.<br />

The Contract Documents may be modified only by <strong>Field</strong> Order, Change Order or<br />

Written Amendment.”<br />

SC‐3.02<br />

Make the following modifications to 3.02 Reference Standards<br />

A. Add a new paragraph “B” as follows:<br />

“B. Comply with applicable construction industry standards as if bound or copied directly<br />

into the Contract Documents regardless of lack of reference in the Contract<br />

Documents. Apply provisions of the Contract Documents where Contract Documents<br />

include more stringent requirements than these referenced standards.<br />

1. Standards referenced directly in the Contract Documents take precedence over<br />

standards that are not referenced but recognized in the construction industry as<br />

applicable.<br />

2. Comply with standards not referenced but recognized in the construction industry<br />

as applicable for performance of the work except as otherwise limited by the<br />

Contract Documents. The Engineer determines whether code or standard is<br />

applicable, or which of several are applicable.<br />

Supplementary Conditions (Revised per <strong>Garney</strong>)<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project - Pump Stations 00 73 00 - 5<br />

12/28/2011