Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

40 90 02.01<br />

INSTALLATION OF PRE-PURCHASED SCADA EQUIPMENT<br />

PART 1 GENERAL<br />

1.1 WORK INCLUDED<br />

A. The Contractor shall furnish all labor, tools, equipment and machinery necessary to<br />

receive, inspect, unload, and install completely in proper operating condition, the<br />

equipment pre-purchased by the Owner and assigned to the Contractor for installation.<br />

Upon acceptance of the equipment, Contractor accepts all responsibility for its condition<br />

and proper operation.<br />

B. The Contractor shall also furnish all incidental items not supplied with the equipment that<br />

may be required for complete installation, such as concrete pad, bolts, wiring, conduit,<br />

grounding, and other appurtenances as necessary. The Contractor shall refer to Appendix<br />

B for the Antenna Tower concrete base requirements.<br />

C. The equipment pre-purchased by the Owner consists, in general, of the following items<br />

for each of the 21 well sites:<br />

1. RTU<br />

2. Antenna Tower<br />

3. Radio Antenna<br />

D. General details of the equipment are provided herein. Technical Specifications for the<br />

pre-selection or pre-purchase of Goods and Special Services are included in Appendix B.<br />

1.2 QUALITY ASSURANCE<br />

A. Inspect the condition of all equipment accepted for installation and promptly advise the<br />

Owner in writing as to any defects or damage that may have occurred during shipment.<br />

B. Provide the services of the Seller’s representative to assist in installation of the equipment<br />

in accordance with the specifications included in appendices and Section 01 70 00<br />

“Execution and Closeout Requirements.” Provide an equipment installation report as<br />

required by Section 01 70 00 “Execution and Closeout Requirements.”<br />

C. The service of the SCADA System Supplier’s representative is available to assist in<br />

installation and start-up of the equipment in accordance with the specifications included<br />

in Appendix B. Contractor shall schedule and request the representative to be available<br />

when needed, to assist and instruct in the proper installation and adjustment of the<br />

equipment. All work and adjustments shall be done in accordance with the SCADA<br />

System Supplier’s recommendations and instructions of their representative.<br />

May 18, 2012<br />

Installation of Pre-Purchased SCADA Equipment<br />

Revision 0 40 90 02.01-1