to meet the requirements of Paragraph 4.01.B, Seller shall promptly notify Buyer and Engineer<br />

and shall, within 20 days after the event giving rise to such notification, provide another bond<br />

and surety, both of which shall comply with the requirements of Paragraphs 4.01.B and 4.02.<br />

4.02 Insurance<br />

A. Seller shall provide insurance of the types and coverages and in the amounts stipulated in the<br />

Supplementary Conditions.<br />

B. Failure of Buyer to demand certificates of insurance or other evidence of Seller's full compliance<br />

with these insurance requirements or failure of Buyer to identify a deficiency in compliance from<br />

the evidence provided shall not be construed as a waiver of Seller’s obligation to maintain such<br />

insurance.<br />

C. Upon assignment of this Contract, Seller shall comply with the written request of assignee to<br />

provide certificates of insurance to assignee.<br />

D. Buyer does not represent that insurance coverage and limits established in this Contract<br />

necessarily will be adequate to protect Seller.<br />

E. The insurance and insurance limits required herein shall not be deemed as a limitation on Seller’s<br />

liability under the indemnities granted to Buyer in the Contract Documents.<br />

4.03 Licensed Sureties and Insurers<br />

A. All bonds and insurance required by the Contract Documents to be purchased and maintained by<br />

Buyer or Seller shall be obtained from surety or insurance companies that are duly licensed or<br />

authorized in the jurisdiction in which the Project is located to issue bonds or insurance policies<br />

for the limits and coverages so required. Such surety and insurance companies shall also meet<br />

such additional requirements and qualifications as may be provided in the Supplementary<br />

Conditions.<br />

ARTICLE 5 – SELLER’S RESPONSIBILITIES<br />

5.01 Supervision and Superintendence<br />

A. Seller shall supervise, inspect, and direct the furnishing of the Goods and Special Services<br />

competently and efficiently, devoting such attention thereto and applying such skills and<br />

expertise as may be necessary to perform its obligations in accordance with the Contract<br />

Documents. Seller shall be solely responsible for the means, methods, techniques, sequences,<br />

and procedures necessary to perform its obligations in accordance with the Contract Documents.<br />

Seller shall not be responsible for the negligence of Buyer or Engineer in the design or<br />

specification of a specific means, method, technique, sequence, or procedure that is shown or<br />

indicated in and expressly required by the Contract Documents.<br />

5.02 Labor, Materials and Equipment<br />

A. Seller shall provide competent, qualified and trained personnel in all aspects of its performance<br />

of the Contract.<br />

EJCDC P-700, Standard General Conditions for Procurement Contracts.<br />

Copyright © 2010 National Society of Professional Engineers, American Council of Engineering Companies,<br />

American Society of Civil Engineers, and Associated General Contractors of America. All rights reserved.<br />