Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

1.3 SUBMITTALS<br />

Submittals for 40 90 01, “Instrumentation” shall not be combined with any other submittals.<br />

Submittals shall be in accordance with Section 01 33 00, “Submittal Procedures” and shall<br />

include:<br />

A.<br />

B.<br />

C.<br />

Shop Drawings<br />

1. Shop drawings shall be submitted to the Engineer for approval before fabrication<br />

or shipment to the job. Equipment shall not be fabricated or shipped to the job<br />

before receipt of approved shop drawings from the Engineer. Submittals for<br />

approval shall include (1) component manufacturing data sheet indicating<br />

pertinent data and identifying each component by item number and<br />

nomenclature, (2) component drawing showing dimensions, mounting, and<br />

external connection details, (3) a system piping schematic and wiring schematic<br />

each on a single drawing with full description of operation, (4) complete<br />

schematic diagram of each piece of electrical and electronic equipment including<br />

electrical valves and tolerances for each component. Component identification<br />

on the schematic shall be as described above.<br />

2. Following approval, the manufacturer shall be responsible for preparation of the<br />

required sets of these drawings for distribution as indicated in Division 0 and<br />

Division 1 specifications.<br />

3. Shop drawings submitted for all equipment furnished under this section of the<br />

specifications, shall be submitted at the same time in the same package. Partial<br />

submittals will not be reviewed.<br />

4. Level Relay Panel<br />

a. Data sheets for miscellaneous electrical equipment.<br />

b. Project specific panel layout, elevations, schematics, details, bill of<br />

materials, etc. for the panel<br />

Sales bulletins and other general publications are not acceptable as submittals for<br />

approval.<br />

Equipment installation Report. Contractor shall provide an Equipment Installation<br />

Report for each instrument (flow meter, level transmitter, etc.) to the Engineer/Owner for<br />

approval. The equipment installation report shall include documentation stating that the<br />

instrument was installed and properly calibrated per the manufacturer’s recommendations<br />

by an Authorized representative of the instrument manufacturer. All parameters required<br />

for programming of the instrument shall be provided in a hard copy format as part of the<br />

equipment installation report. Documentation stating that the person performing the<br />

calibration and start-up is an authorized representative shall be provided as well.<br />

May 18, 2012<br />

Instrumentation<br />

Revision 0 40 90 01- 3