Daniel B. Stephens & Associates, Inc.<br />

24. 2.1 G. 2 Exception to the specification. Lip seal unavailable on this product - Seals will be single<br />

Silicon Carbide<br />

The use of “substitutions” and “as equal” items will be evaluated for the selected <strong>Bid</strong>der.<br />

25. 2.1 G. 4 Exception to the specification - Thrust bearings are not rated @ 20,000# recommend a<br />

safety factor of duty thrust to 2 x pump thrust to motor thrust bearing rating.<br />

The use of “substitutions” and “as equal” items will be evaluated for the selected <strong>Bid</strong>der.<br />

26. 2.1.G.4 Exception to the specification - Thrust bearings are not cooled by a circulating system and<br />

should be eliminated. Circulation system needed if heat exchanger is used.<br />

The use of “substitutions” and “as equal” items will be evaluated for the selected <strong>Bid</strong>der.<br />

27. 2.1.G.5.5 Exception to the specification - SS stator is not coated. To do so would impede cooling<br />

The use of “substitutions” and “as equal” items will be evaluated for the selected <strong>Bid</strong>der.<br />

28. 2.1.G.5.6 Clarification to the specification - Unsure if manufacture’s standard meets specification.<br />

Please advise - Flowserve Bearings are solid Hard Carbon/Graphite with grooves.<br />

The use of “substitutions” and “as equal” items will be evaluated for the selected <strong>Bid</strong>der.<br />

29. 2.1.G.5.7 Clarification note to the specification - Manufactures Standard motors are PVC insulationmanufacture<br />

could comply with specification with PE2+PA material, but would not be able to meet<br />

delivery and end user would incur much higher cost. Request Specification change to wire winding<br />

insulation “Manufacturers Standard” (PVC vs. PE2+PA)<br />

The use of “substitutions” and “as equal” items will be evaluated for the selected <strong>Bid</strong>der.<br />

30. 2.1.G.5.9 Specification exception - Pleuger motors have top portion of shaft of duplex stainless steel<br />

and bottom is high surface finish. Shafts do not wear like a pump shaft will.<br />

The use of “substitutions” and “as equal” items will be evaluated for the selected <strong>Bid</strong>der.<br />

31. 2.1.G.5.10 Specification exception - Could not use stock motors and could not meet delivery.<br />

Recommend change to balance per manufacturers standard.<br />

The use of “substitutions” and “as equal” items will be evaluated for the selected <strong>Bid</strong>der.<br />

32. 2.1.H Request specification change to “Manufacture responsible to supply with manufacture splice<br />

+ Hi-Pot Test instead of well installer supplying. 2.1.I<br />

The use of “substitutions” and “as equal” items will be evaluated for the selected <strong>Bid</strong>der.<br />

33. 2.1 I. Specification clarification - Normally the installer supplies the ss cable supports. Are these<br />

in the installing contractors scope of work?<br />

The items in 2.1 I will be in this Contract Scope of Work.<br />