01 33 00 SUBMITTAL PROCEDURES<br />

1.00 GENERAL<br />

1.01 WORK INCLUDED<br />

A. Submit documentation as required by the Contract Documents and as reasonably requested<br />

by the CMAR, Owner and Engineer to:<br />

1. Record the products incorporated into the Project for the Owner.<br />

2. Provide information for operation and maintenance of the Project.<br />

3. Provide information for the administration of the Contract.<br />

4. Allow the CMAR/Engineer to advise the Owner if products proposed for the project by<br />

the <strong>Bid</strong>der conform, in general, to the design concepts of the Contract Documents.<br />

B. <strong>Bid</strong>der's responsibility for full compliance with the Contract Documents is not relieved by<br />

the CMAR/Engineer's review of submittals. Contract modifications can only be approved by<br />

Change Order or <strong>Field</strong> Order.<br />

1.02 BIDDER'S RESPONSIBILITIES<br />

A. Review and certify all submittals prior to submission.<br />

B. Determine and verify:<br />

1. <strong>Field</strong> measurements.<br />

2. <strong>Field</strong> construction requirements.<br />

3. Location of all existing structures, utilities and equipment related to the submittals.<br />

4. Submittals are complete for their intended purpose.<br />

5. Conflicts between the submittals related to the various Subcontractors and Suppliers<br />

have been resolved.<br />

6. Quantities and dimensions shown on the submittals.<br />

C. Submit information per the procedures described in this section and the detailed<br />

specifications.<br />

D. Furnish the following submittals:<br />

1. As specified in the Submittal Schedule to be provided with Contract Documents when<br />

the design in complete.<br />

2. Schedules, data and other documentation as described in detail in this section or<br />

referenced in the Contract Documents.<br />

3. Documentation required for the administration of the Contract per Section 01 31 13,<br />

Project Coordination.<br />

4. Shop Drawings required for consideration of a contract modification per Paragraph 1.<strong>08</strong>.<br />

5. Submittals as required in the detailed specifications.<br />

6. Submittals not required will be returned without CMAR/Engineer's review.<br />

E. Submit a schedule indicating the date submittals will be sent to the CMAR and proposed<br />

dates that the product will be incorporated into the project. Make submittals promptly in<br />

accordance with the schedule to cause no delay in the Project.<br />

1. Send submittals to the CMAR allowing a reasonable time for delivery, review and<br />

marking submittals. Include time for review of a resubmission if necessary. Allow<br />

Submittal Procedures – <strong>Bid</strong> <strong>Package</strong> #8 01 33 00-1<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project – <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

5/24/2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!