25.10.2014 Views

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

OVERHEAD SERVICE TO FOUR OR<br />

MORE SECONDARY SERVICE METERS<br />

FIGURE 3-H<br />

NOTES:<br />

1. A service enclosure (see 500.<strong>08</strong>,<br />

page 43), installed by Customer on<br />

outside wall of building, is required<br />

for Secondary Service installations<br />

through 2500 amperes with four or<br />

more meter sockets. See Figure<br />

3-G, page 27 for installations of less<br />

than four meter sockets. Contact<br />

Company for determination of<br />

service enclosure requirements. For<br />

multifamily installations, see Figure<br />

5-E, page 56.<br />

2. Service head, service raceway and main service entrance conductors provided, installed<br />

and maintained by Customer. Line side conductors from weatherheads are to contact<br />

the center of bus bars. Load conductors to meter sockets to be connected equally on<br />

both ends of bus bars to obtain full current rating.<br />

3. Conductors and raceways provided, installed and maintained by Customer.<br />

4. Meter sockets shall be provided, installed and maintained by the Customer.<br />

Transockets, when required, shall be provided by Company and installed and<br />

maintained by Customer. Sockets must be securely attached to wall.<br />

5. For use on service voltages through 480 volts.<br />

6. Service entrance conductors to be continuous from meter sockets to service enclosure.<br />

7. Customer provides all connectors and makes all connections in the enclosure.<br />

Approved connectors, plated 3/8” minimum diameter bolts, belleville washers, and<br />

oxide inhibitor are required for connections to plated aluminum bus.<br />

8. See Figure 2-A, page 14 for service drop clearances.<br />

9. Service switches, when installed near the service enclosure, should not interfere with<br />

service to an occupancy.<br />

10. Service entrance conductors to extend from weatherhead to service landing, but in no<br />

case less than 36” minimum. Service head(s) shall be located within 3’ of service<br />

landing attachment. No more than six service masts allowed without prior Company<br />

approval.<br />

11. Customer installs service drop attachment of adequate strength for Company’s service<br />

drop conductors. See Figure 3-B, page 22.<br />

12. Insulated conduit bushings are required for raceways terminating in the meter base.<br />

13. The use of flexible metallic conduit, liquid tight flexible metallic conduit, and liquid tight<br />

flexible non-metallic conduit for service entrance raceway is prohibited unless approved<br />

by the local inspecting authority.<br />

14. Each socket must be clearly and permanently marked indicated in Section 500.11, page<br />

43.<br />

15. The use of Schedule 40 or 80 PVC for service mast not supporting service drop is<br />

allowed unless prohibited by the local inspecting authority.<br />

16. Not for 3 wire delta services. See Figure 3-I, page 29.<br />

Copyright 2010 Oncor Electric Delivery Company. All rights reserved<br />

28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!