OVERHEAD THREE WIRE DELTA SERVICES<br />

FIGURE 3-I<br />

NOTES:<br />

1. Service drop conductor (quadraplex) provided, installed, and connected by Company.<br />

2. Customer installs service drop attachment of adequate strength for attachment of<br />

Company’s service drop conductors. See Figure 3B, page 22.<br />

3. Service mast shall be of sufficient height for the service drop to meet minimum<br />

clearances (see Figure 2-A, page 14). A 2” rigid steel or 2 ½” IMC conduit minimum<br />

with no coupling is required. EMT is not acceptable for service mast. Service mast to<br />

be of sufficient strength to support service drop.<br />

4. Customer to install conduit grounding clamp for bonding service drop messenger to<br />

service raceway. Company shall connect service messenger to the neutral at the<br />

transformer pole, ground at every intermediate pole, and connect to the conduit<br />

grounding clamp at the service raceway.<br />

5. Meter base enclosure and service raceways shall be connected to the grounded<br />

system conductor or to the grounding electrode conductor as per the NEC.<br />