25.10.2014 Views

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

B. Upon completion of the installation of the pumps, the services of the service engineer<br />

indicated above shall be provided for calibration and startup of the equipment and for<br />

instructing the operating personnel. The Manufacturer shall provide sufficient service to<br />

place the system in satisfactory operation.<br />

C. Check out and calibrate the system upon completion of the installation.<br />

D. Prior to the Owner turning on any form of energy to the system, the Contractor shall<br />

provide the Engineer with a certified statement of approval of the installation including<br />

his supplier's authorization for turning on energy to the system.<br />

END OF SECTION<br />

May 18, 2012<br />

Instrumentation Flow Meters<br />

Revision 0 40 90 01.01-6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!