25.10.2014 Views

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

3.3 Installation<br />

A. Install the equipment in accordance with the drawings and SCADA System Supplier’s<br />

written instructions.<br />

B. Make sure that each piece of equipment is securely anchored to supports and its<br />

foundations.<br />

C. The equipment shall be electrical hard wired at the locations shown on the drawings.<br />

END OF SECTION<br />

May 18, 2012<br />

Installation of Pre-Purchased SCADA Equipment<br />

Revision 0 40 90 02.01-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!