Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

I. Flexible metal conduit used for connecting light fixtures, i.e., fixture whips, shall be 1/2"<br />

as a minimum. Fixture whips shall contain only three conductors: one hot, one neutral,<br />

and one equipment grounding conductor. Other conduit types shall be 3/4" as a<br />

minimum. The inside surface of the conduit shall be reamed smooth after it has been cut.<br />

J. Provide conduit sizes as shown on the plans. Where hash marks are used to indicate the<br />

number of conductors in a conduit without indicating the conduit size, provide a 3/4"<br />

conduit for up to nine #12 conductors, and a 1" conduit for ten to 20 #12 conductors.<br />

K. Where conduits stub up through a floor slab from below finished floor level for multilevel<br />

structures, install a threaded fitting with PVC plug so that the top of the fitting is<br />

flush with the concrete or finished floor surface.<br />

L. Conduit system shall be swabbed clean prior to installation of conductors.<br />

M. Ground conduits in accordance with the National Electrical Code and Specification 26 05<br />

26, “Grounding & Bonding For Electrical Systems”.<br />

N. Contractor shall properly tape PVC coated aluminum conduit where it transitions to PVC<br />

conduit in underground concrete encased duct banks so that no aluminum conduit is in<br />

contact with concrete encasement. Tape shall be manufactured by Scotch or approved<br />

equal. Coordinate with tape manufacturer for type of tape to use for the installation.<br />

O. Conduit shall not penetrate the top of NEMA 3R and NEMA 4X enclosures.<br />

3.3 UNDERGROUND<br />

A. Underground conduit from the service entrance disconnect switch to the equipment rack<br />

disconnect shall be concrete encased, all other underground conduit shall be concrete<br />

capped.<br />

B. Bury underground conduit a minimum of 18" deep for low voltage duct banks to the top<br />

of the concrete cap/encasement, and as shown on the plans, whichever is greater.<br />

Backfill buried conduit banks with material which is free from large rock, paving<br />

material, or large angular substance. Install underground conduit with the conduit duct<br />

bank dimensions shown on the plans. Adhere to conduit spacing by using spacers at<br />

intervals to ensure that proper spacings are maintained. The concrete shall be red in<br />

color. Red dye for duct bank shall be mixed with concrete or the top of the duct bank<br />

shall be painted red.<br />

C. For installation of conduits to be used by Oncor Electric Delivery, coordinate with the<br />

utility for exact requirements<br />

D. Grade underground and outdoor conduits to drain free of condensation and moisture.<br />

Provide for automatic draining at lowpoints. Install horizontal runs of conduit to provide<br />

a natural drain for condensation without pockets or traps where moisture may collect.<br />

E. Underground conduits shall drain to an underground structure with a floor drain, such as<br />

a manhole or a building basement.<br />

May 18, 2012<br />

Conduits<br />

Revision 0 26 05 33.01 - 5