Colorado River Municipal Water District<br />

Vertical Turbine Submersible Pumping Units<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

to the concrete well seal block with stainless steel expansion anchors at least 6 inches in<br />

length and of a diameter as recommended by the pumping unit manufacturer.<br />

G. The Contractor shall install the conductors in the conduit and incidental items necessary<br />

for installing the power cable from the wellhead junction box to the motor controller. The<br />

electrical work shall be done by a licensed electrician. All conduit and wiring shall be<br />

sized, installed, and grounded in accordance with the National Electrical Code or as<br />

modified in the plans or specifications.<br />

H. After the equipment has been installed it shall be checked for proper operation as<br />

indicated in Part 1, System Startup, Owner’s Instruction, and Commissioning.<br />

3.2 Disinfection of <strong>Well</strong> (by others, not in this Contract)<br />

A. The Contractor is advised that all wells were previously disinfected after construction and<br />

were found to be absent of coliform. Three consecutive days of testing were performed<br />

during the step-drawdown test. The disinfected condition of the wells is unknown and<br />

will be required as part of this contract after the permanent pumping equipment is set.<br />

B. It shall be the Contractor’s responsibility to disinfect the wells in such a manner as to<br />

comply with the requirements of TCEQ Chapter 290, Water Hygiene. Official testing for<br />

coliform will be conducted after the permanent pump has been installed. A minimum of<br />

10 casing volumes shall have been evacuated prior to obtaining the official samples for<br />

testing. Disinfecting the wells shall be accomplished by the Contractor in accordance<br />

with AWWA C654-97, Disinfection of <strong>Well</strong>s, including the safe disposal of high<br />

concentrations of chlorinated water.<br />

C. Merely introducing a chlorine solution into the well will not be considered satisfactory.<br />

The water in the well casing shall be treated with chlorine to give an average chlorine<br />

dose of 50 mg/L to the entire volume of water in the casing. After the chlorine has been<br />

applied, surge the well at least three times to improve the mixing and induce contact of<br />

the chlorinated water with the adjacent aquifer. Surging of the well to induce mixing of<br />

the disinfectant may not be possible with the permanent pumping equipment as the<br />

column pipe will be fitted with a check valve. It may be necessary for the Contractor to<br />

utilize his own auxiliary pumping equipment to achieve the required surging of the wells.<br />

The chlorinated water shall rest in the casing for at least 12 hours, but no more than<br />

24 hours.<br />

D. Following the rest period, circulate the chlorinated water by pumping, wasting some of<br />

the water and returning some to the well, periodically testing for chlorine residual.<br />

Testing for chlorine residual shall be performed by the Contractor or his approved testing<br />

laboratory. When zero chlorine residual is measured, continue pumping the well to waste<br />

for at least 15 minutes or 10 casing diameters, whichever is greater. The Contractor shall<br />

then sample the well for bacteriological evaluation. Samples shall be submitted to a<br />

Texas Department of Health approved laboratory for chemical analysis until three<br />

successive daily raw water samples are free of coliform organisms.<br />

E. The bacteriological evaluation shall be tested by a Texas Department of Health approved<br />

laboratory for the presence of coliform in accordance with Standard Methods of the<br />

January 2012<br />

Submersible Vertical Turbine Pumping Units<br />

Revision 0 11210 - 12