Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

SECTION 26 05 00<br />

COMMON WORK RESULTS FOR ELECTRICAL<br />

PART 1 GENERAL<br />

1.1 WORK INCLUDED<br />

A. Furnish labor, materials, equipment and incidentals necessary for complete and<br />

operational electrical systems, as specified herein.<br />

B. This Section, as well as Division 1, concerns all other Sections in Division 26, and shall<br />

be considered a part of each of those Sections as if written in their entirety.<br />

1.2 QUALITY ASSURANCE<br />

A. Electrical Contractors' Qualifications<br />

1. Use adequate numbers of skilled workmen, trained and experienced in their crafts,<br />

and who are familiar with the specifications and methods of performing the work<br />

in this Division. A licensed Journeyman shall be on site at all times when<br />

electrical work is being performed. Electrical work shall be performed under the<br />

direct supervision of a Master Electrician who holds a valid license in the State of<br />

Texas. The Contractor shall provide a monthly report to the Owner/Engineer for<br />

review stating that the Master Electrician has been to the job site and thoroughly<br />

reviewed the work. The report shall be signed by the Master Electrician and<br />

include the data and time the Master Electrician was on site.<br />

B. Workmanship<br />

1. Work shall be performed in accordance with quality, commercial practices. The<br />

appearance of finished work shall be of equal importance with its operation.<br />

Materials and equipment shall be installed based upon the actual dimensions and<br />

conditions at the project site. Locations for materials or equipment requiring an<br />

exact fit shall be field measured. Conduit and motors shall be isolated to avoid<br />

unacceptable noise levels from objectionable vibrations from all systems.<br />

1.3 SUBMITTALS<br />

A. Submittals shall be separated by specification section and shall not be combined with any<br />

submittals for a separate specification section. Submittals shall be in accordance with<br />

Section 01 33 00, “Submittal Procedures” and shall include:<br />

1. Component catalog number and manufacturing data sheet, indicating pertinent<br />

data and identifying each component by the item number and nomenclature as<br />

specified.<br />

2. Component drawings showing dimensions, mounting, and external connection<br />

details in AutoCAD format.<br />

May 18, 2012<br />

Common Work Results for Electrical<br />

Revision 0 26 05 00-1