4. Electrical and interconnection diagrams shall show all terminations of equipment,<br />

complete with conduit, cable, and equipment designations, and shall include terminal<br />

identification information.<br />

5. Include size of all conduits, pipe, cables, and conductors.<br />

6. Physical arrangement drawings shall include operating and servicing clearance<br />

requirements, cooling requirements, electrical power requirements, and cabling<br />

information.<br />

7. Logic drawer drawings shall show used space and expansion space.<br />

8. Show appropriate tag numbers on all product data.<br />

9. Software specifications for all software provided in addition to existing standard<br />

software.<br />

a. Include fully annotated source listings, input-output requirements, memory<br />

requirements, timing and sequencing requirements, flow chart showing functions<br />

performed, operating sequences and decision points, required system<br />

configuration, list of known or anticipated limitations of software modules, list of<br />

malfunction procedures to be followed for recovering from operator error or other<br />

malfunction, and description of how each module interfaces with calling and called<br />

programs.<br />

b. Provide proposed screen layouts showing modifications to existing screens, and<br />

new screens: Show all displays, inputs, outputs, recorders, alarms and indications<br />

along with the associated signal tag number. OWNER shall review and approve<br />

screen layouts.<br />

B. TECHNICAL MANUALS:<br />

2.00 PRODUCTS<br />

1. Supply six (6) sets of technical manuals with software specifications to OWNER's<br />

Representative no later than the equipment shipment date. Each set shall be bound in<br />

a standard size, three-ring, loose-leaf, vinyl plastic, hard-cover binder suitable for<br />

bookshelf storage. Binder ring size shall not exceed 2.5 inches.<br />

2. Each set of technical manuals shall include a general and detailed description, a theory<br />

of operation description, detailed schematic drawings, specifications, and installation,<br />

connection, calibration, operating, troubleshooting, preventive maintenance, and<br />

overhaul instructions in complete detail with a clear and specific description of the<br />

steps the operators must take to perform each of the tasks and modes of operating<br />

specified. These manuals shall provide the OWNER with comprehensive information on<br />

all systems and components to enable operation, service, maintenance and repair.<br />

Exploded or other detailed views of all instruments, assemblies, and accessory<br />

components shall be included together with complete parts lists and ordering<br />

instructions. These manuals are in addition to all applicable requirements of Division 01<br />

- General Requirements.<br />

2.01 INFORMATION ON DRAWINGS<br />

A. The following information is indicated on the drawings:<br />

1. Loop diagram on flow sheet for each control loop. Diagrams are schematic in nature<br />

and intended only as a guide to work to be performed.<br />

Instrumentation and Control for Process Systems 40 90 00-5<br />

CMD11269 – Ward County Transmission System Expansion – Contract C – Above Slab TPS, OPS, and WPS