C. Include the amount if cost savings to the Owner for deviations that result in a reduction in<br />

cost.<br />

D. A Change Order or <strong>Field</strong> Order will be issued by the CMAR/Engineer for deviations approved<br />

by the Owner. Deviations from the Contract Documents may only be approved by Change<br />

Order or <strong>Field</strong> Order.<br />

1.<strong>08</strong> SUBMITTALS FOR EQUAL NON-SPECIFIED PRODUCTS<br />

A. The products of the listed suppliers are to be furnished where detailed specifications list<br />

several manufacturers but do not specifically list "or equal" or "or approved equal"<br />

products. Use of any products other than those specifically listed is a substitution and<br />

must be approved per Paragraph 1.09.<br />

B. <strong>Bid</strong>der may submit other manufacturers' products that are in full compliance with the<br />

specification where detailed specifications list one or more manufacturers followed by the<br />

phase "or equal" or "or approved equal.”<br />

1. Submit Shop Drawings of adequate detail to document that the proposed product is<br />

equal or superior to the specified product.<br />

2. Prove that the product is equal. It is not the CMAR/Engineer's responsibility to prove<br />

the product is not equal.<br />

a. Indicate on a point by point basis for each specified feature that the product is equal<br />

to the Contract Document requirements.<br />

b. Make a direct comparison with the specified manufacturer's published data sheets<br />

and available information. Provide this printed material with the submittal.<br />

c. The decision of the CMAR/Engineer regarding the acceptability of the proposed<br />

product is final.<br />

3. Provide a typewritten certification that, in furnishing the proposed product as an equal,<br />

the <strong>Bid</strong>der:<br />

a. Has thoroughly examined the proposed product and has determined that it is equal<br />

or superior in all respects to the product specified.<br />

b. Has determined that the product will perform in the same manner and result in the<br />

same process as the specified product.<br />

c. Will provide the same warranties and/or bonds as for the product specified.<br />

d. Will assume all responsibility to coordinate any modifications that may be necessary<br />

to incorporate the product into the construction and will waive all claims for<br />

additional Work which may be necessary to incorporate the product into the Project<br />

which may subsequently become apparent.<br />

e. Will maintain the same time schedule as for the specified product.<br />

4. A modification request is not required for any product that is in complete compliance<br />

with the Contract Documents.<br />

1.09 SUBMITTALS FOR SUBSTITUTIONS<br />

A. Substitutions are defined as any product that the <strong>Bid</strong>der proposes to provide for the<br />

Project in lieu of the specified product.<br />

B. Submit the following for consideration of approval of a Supplier or product which is not<br />

specified::<br />

Submittal Procedures – <strong>Bid</strong> <strong>Package</strong> #8 01 33 00-8<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project – <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

5/24/2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!