25.10.2014 Views

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

1.3 CLOSEOUT SUBMITTALS<br />

A. Operation and Maintenance Data: Submit spare parts lists and maintenance procedures.<br />

1.4 WARRANTY<br />

A. Furnish minimum one year manufacturer warranty for all materials.<br />

PART 2 PRODUCTS<br />

2.1 PLUMBING AND PIPING<br />

A. Water Piping, above Grade:<br />

1. Steel Pipe (Cold Water Only Sizes 4 inch and Larger): ASTM A53/A53M, Grade<br />

B, Schedule 40 with cast iron fittings.<br />

a. Shall be cement-mortar lined in accordance with the most recent version<br />

of AWWA C205.<br />

b. The exterior of the pipe shall be epoxy coated in accordance with the<br />

most recent version of AWWA C210.<br />

B. Water Piping, below Grade:<br />

1. PVC Pipe: AWWA C900, DR18<br />

2.2 PIPING SPECIALTIES<br />

A. Flanges, Unions, and Couplings:<br />

1. Pipe Size 2 inches and Under: Malleable iron unions for threaded ferrous piping;<br />

bronze unions for copper pipe, soldered joints.<br />

2. Pipe Size Over 2 inches: Forged steel flanges for ferrous piping; bronze flanges<br />

for copper piping; preformed neoprene gaskets.<br />

3. Grooved and Shouldered Pipe End Couplings: Malleable iron housing, C-shape<br />

elastomer composition sealing gasket, steel bolts, nuts, and washers.<br />

4. Dielectric Connections: Union with galvanized or plated steel threaded end,<br />

copper solder end, water impervious isolation barrier.<br />

PART 3 EXECUTION<br />

3.1 EXAMINATION<br />

A. Verify excavations are to required grade, dry, and not over-excavated.<br />

3.2 PREPARATION<br />

A. Ream pipe and tube ends. Remove burrs. Bevel plain end ferrous pipe.<br />

B. Remove scale and dirt on inside and outside piping before assembly.<br />

May 18, 2012<br />

Plumbing and Piping<br />

Revision 0 22 10 00 - 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!