Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

SECTION 40 90 01<br />

INSTRUMENTATION<br />

PART 1 GENERAL<br />

1.1 WORK INCLUDED<br />

A.<br />

B.<br />

C.<br />

D.<br />

E.<br />

Furnish labor, materials, equipment and incidentals necessary to install all equipment for<br />

complete instrumentation and controls. Contractor's work shall include but not be limited<br />

to the following:<br />

1. Instrumentation and Level Relay Panel<br />

2. Installation of equipment furnished under this contract.<br />

3. Interconnections between equipment furnished under this contract.<br />

4. Interconnection between equipment furnished under this contract and the existing<br />

instrumentation and control equipment or that furnished and installed under other<br />

contracts.<br />

The Contractor's attention is directed to the fact that instrumentation is an integrated<br />

system and as such shall be furnished by one vendor or system integrator who shall<br />

provide all the equipment and appurtenances, regardless of manufacture, and be<br />

responsible to the Contractor for satisfactory operation of the entire system.<br />

Supervision, labor, tools, and materials necessary for installation of the instrumentation<br />

equipment and material furnished herein and their interconnection shall be provided by<br />

the Contractor. Installation work shall conform to applicable city, state, and national<br />

building and electrical codes.<br />

Coordinate the work of the system manufacturer's service personnel during construction,<br />

testing, calibration and acceptance of the instruments.<br />

Provide equipment as shown in the specifications and on the drawings.<br />

1.2 QUALITY ASSURANCE<br />

A.<br />

B.<br />

GENERAL: Equipment shall be the Manufacturer's latest and proven design.<br />

Specifications and drawings call attention to certain features, but do not purport to cover<br />

all details entering into the design of the instrumentation system. The completed system<br />

shall be compatible with the functions required and the equipment furnished by the<br />

Contractor.<br />

OPERATING VOLTAGE: Electrical components of the system shall operate on 120<br />

volt, single-phase, 60 Hertz, except as otherwise noted in the specifications.<br />

May 18, 2012<br />

Instrumentation<br />

Revision 0 40 90 01- 1