25.10.2014 Views

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Colorado River Municipal Water District<br />

Vertical Turbine Submersible Pumping Units<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

SECTION 01010<br />

SUMMARY OF WORK<br />

PART 1 GENERAL<br />

1.1 Summary<br />

A. Section Includes<br />

1. Contract Description.<br />

2. Work by Seller.<br />

3. Contract Time and General Order of <strong>Construction</strong>.<br />

4. Approval of Equipment and Materials.<br />

5. Warranty.<br />

1.2 Contract Description<br />

A. The project includes furnishing twenty-one (21) deep well submersible turbine pumping<br />

units for use in constructed municipal potable water wells located in Ward County,<br />

Texas, USA for the Colorado River Municipal Water District (CRMWD). The wells have<br />

been previously constructed under a separate contract and their final capacities<br />

determined for the purpose of sizing pumping equipment.<br />

B. Contract Type is unit price basis for work actually performed and measured.<br />

C. Seller shall make every effort to sequentially deliver all equipment to the project site as<br />

stipulated in the Contract Documents.<br />

1.3 Work by Seller<br />

A. The Seller shall perform all the Work specified in the individual specification sections,<br />

including the following:<br />

1. Provide labor, equipment, and materials to construct and furnish submersible<br />

pumping units and appurtenances.<br />

2. Deliver specified products in a timely manner and as required by the Contract<br />

Documents.<br />

3. Provide the services of a competent factory-trained field service technical<br />

representative for each pump installation. Representative’s duties shall include<br />

assisting the installation contractor (not this Contract) with the installation of the<br />

equipment assuring proper alignment and coupling, testing, and instructing the<br />

owner on proper operation and maintenance of the equipment.<br />

4. Provide certified testing reports and field measurements necessary to demonstrate<br />

efficiency(ies) required by the Contract Documents can be validated. Other<br />

required testing will include shop testing of pump and motor to provide certified<br />

test curves prior to acceptance.<br />

5. With assistance from the Engineer, coordinate delivery of pumping equipment<br />

with the installation contractor.<br />

6. Provide submittals in accordance with Section 01300 Submittals.<br />

January 2012<br />

Summary of Work<br />

Revision 0 01010 - 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!