25.10.2014 Views

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CONTRACTOR’s failure to so report will constitute an<br />

acceptance of such other work as fit and proper for integration<br />

with CONTRACTOR’s Work except for latent defects and<br />

deficiencies in such other work.<br />

7.02 Coordination<br />

A. If OWNER intends to contract with others for the<br />

performance of other work on the Project at the Site, the<br />

following will be set forth in Supplementary Conditions:<br />

1. the individual or entity who will have authority<br />

and responsibility for coordination of the activities among<br />

the various contractors will be identified;<br />

2. the specific matters to be covered by such<br />

authority and responsibility will be itemized; and<br />

3. the extent of such authority and responsibilities<br />

will be provided.<br />

B. Unless otherwise provided in the Supplementary<br />

Conditions, OWNER shall have sole authority and responsibility<br />

for such coordination.<br />

ARTICLE 8 - OWNER’S RESPONSIBILITIES<br />

8.01 Communications to Contractor<br />

A. Except as otherwise provided in these General Conditions,<br />

OWNER shall issue all communications to<br />

CONTRACTOR through ENGINEER.<br />

8.02 Replacement of ENGINEER<br />

A. In case of termination of the employment of ENGI-<br />

NEER, OWNER shall appoint an engineer to whom<br />

CONTRACTOR makes no reasonable objection, whose status<br />

under the Contract Documents shall be that of the former<br />

ENGINEER.<br />

8.03 Furnish Data<br />

A. OWNER shall promptly furnish the data required of<br />

OWNER under the Contract Documents.<br />

8.04 Pay Promptly When Due<br />

A. OWNER shall make payments to CONTRACTOR<br />

promptly when they are due as provided in paragraphs<br />

14.02.C and 14.07.C.<br />

A. OWNER’s duties in respect of providing lands and<br />

easements and providing engineering surveys to establish<br />

reference points are set forth in paragraphs 4.01 and 4.05.<br />

Paragraph 4.02 refers to OWNER’s identifying and making<br />

available to CONTRACTOR copies of reports of explorations<br />

and tests of subsurface conditions and drawings of physical<br />

conditions in or relating to existing surface or subsurface<br />

structures at or contiguous to the Site that have been utilized<br />

by ENGINEER in preparing the Contract Documents.<br />

8.06 Insurance<br />

A. OWNER’s responsibilities, if any, in respect to purchasing<br />

and maintaining liability and property insurance are<br />

set forth in Article 5.<br />

8.07 Change Orders<br />

A. OWNER is obligated to execute Change Orders as<br />

indicated in paragraph 10.03.<br />

8.<strong>08</strong> Inspections, Tests, and Approvals<br />

A. OWNER’s responsibility in respect to certain inspections,<br />

tests, and approvals is set forth in paragraph 13.03.B.<br />

8.09 Limitations on OWNER’s Responsibilities<br />

A. The OWNER shall not supervise, direct, or have<br />

control or authority over, nor be responsible for,<br />

CONTRACTOR’s means, methods, techniques, sequences, or<br />

procedures of construction, or the safety precautions and<br />

programs incident thereto, or for any failure of CON-<br />

TRACTOR to comply with Laws and Regulations applicable<br />

to the performance of the Work. OWNER will not be<br />

responsible for CONTRACTOR’s failure to perform the<br />

Work in accordance with the Contract Documents.<br />

8.10 Undisclosed Hazardous Environmental Condition<br />

A. OWNER’s responsibility in respect to an undisclosed<br />

Hazardous Environmental Condition is set forth in paragraph<br />

4.06.<br />

8.11 Evidence of Financial Arrangements<br />

A. If and to the extent OWNER has agreed to furnish<br />

CONTRACTOR reasonable evidence that financial<br />

arrangements have been made to satisfy OWNER’s<br />

obligations under the Contract Documents, OWNER’s<br />

responsibility in respect thereof will be as set forth in the<br />

Supplementary Conditions.<br />

8.05 Lands and Easements; Reports and Tests<br />

00700 - 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!