adequate time for the submittal review process, ordering, fabrication, and delivery of<br />

the product to not delay progress on the Project.<br />

2. Schedule submittal to provide all information for interrelated work at one time. No<br />

review will be performed on submittals requiring coordination with other submittals.<br />

CMAR will return submittals for resubmission as a complete package.<br />

F. Submit information for all of the components and related equipment required for a<br />

complete and operational system in the same submittal.<br />

1. Include electrical, mechanical, and other information required to indicate how the<br />

various components of the system function.<br />

2. Provide certifications, warranties, and written guarantees with the submittal package<br />

for review when they are required.<br />

G. Fabrication or installation of any products prior to the approval of Shop Drawings is done at<br />

the <strong>Bid</strong>der's risk. Products not meeting the requirements of Contract Documents are<br />

defective and may be rejected at the CMAR/Owner's option.<br />

H. Payment will not be made for products for which submittals are required until the<br />

submittals have been received. Payment will not be made for products for which Shop<br />

Drawings or Samples are required until these are approved by the CMAR/Engineer.<br />

1.03 QUALITY ASSURANCE<br />

A. Submit legible, accurate, complete documents presented in a clear, easily understood<br />

manner. Submittals not meeting these criteria will be returned without review.<br />

B. Demonstrate that the proposed products are in full and complete compliance with the<br />

design criteria and requirements of the Contract Documents including Drawings and<br />

Specifications as modified by Addenda, <strong>Field</strong> Orders, and Change Orders.<br />

C. Furnish and install products that fully comply with the information included in the submittal.<br />

D. Review and approve submittals prior to submitting them to the CMAR for review.<br />

Submittals will not be accepted anyone other than the <strong>Bid</strong>der.<br />

1.04 SUBMITTAL PROCEDURES<br />

A. Submit an electronic copy of each submittal through the Project portal (web site) provided<br />

by the CMAR/Engineer. The <strong>Bid</strong>der will be provided access to log onto the website to post<br />

submittal documents and check the status of submittals.<br />

1. The complete contents of each submittal, including associated drawings product data,<br />

etc., shall be submitted in Portable Document Format (PDF.) Submit PDF document<br />

with adequate resolution to allow documents to be printed in a format equivalent to the<br />

document original. Documents are to be scalable to allow printing on standard 81/2 x<br />

11 or 11 x 17 papers.<br />

2. Create and submit color PDF documents where color is important to the evaluation of<br />

the submittal and / or where comments will be lost if only black and white PDF<br />

documents are provided. Submit sample and color charts per Paragraph 1.04 H<br />

B. Transmit all submittals, with a properly completed Submittal Transmittal Form as provided<br />

by the CMAR/Engineer (provided after Notice of Award).<br />

Submittal Procedures – <strong>Bid</strong> <strong>Package</strong> #8 01 33 00-2<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project – <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

5/24/2012